Topic | Recent |
---|---|
Buildable LandNC-v4 LTc4: Surrounding density and diverse usesposted by Deborah Stadler on Nov 9, 2022, 6:13 pm
Does a Regional Detention Pond for a planned development count as 'buildable land' per LEED? We think since it has been set aside for water retention, is should not be included in the 'buildable... Last reply: Deborah Lucking, Nov 11, 2022, 3:18 pm |
|
Change of Fundamental Commissioning AgentNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Ilana Judah on Sep 16, 2014, 9:28 am
We are working on a project that is now under construction. Fundamental Commissioning was started by one party, with Enhanced Commissioning being undertaken by a second party. The owner has now... Last reply: Craig Graber, Nov 11, 2022, 11:01 am |
|
Natural ventilation in polluted citiesCI-v4 EQp1: Minimum indoor air quality performanceposted by Antonio Tenorio on Nov 10, 2022, 2:02 pm
I'm working on an ID+C project located in Mexico City. The owner wants to implement natural ventilation to save energy. The main challenge is the outdoor air pollutants. Mexico... |
|
EVSE and ADA parking spacesNC-v4.1 LTc8: Electric Vehiclesposted by Bryna Dunn on May 24, 2019, 10:17 am
Has anyone submitted a project that includes ADA spaces in the spaces served by EVSE? For example, if a total of 3 charging stations are required on a project, and one of those is placed at an... Last reply: Bryna Dunn, Nov 10, 2022, 1:52 pm |
|
Approved Documentation for the California Department of Public Health General Emissions EvaluationNC-v4.1 EQc2: Low-emitting materialsposted by Summer Gorder on Jan 14, 2020, 12:24 pmcertificates, the certification period must overlap with the project’s construction period." Thought I would post to help supplement an already excellent forum post! Thanks all!! Log in or register to post comments Gregor Braugman Sustainability Specialist LEEDuser Basic Member 7 thumbs up March 24, 2021- 12:00 pm Scott, thank you for posting in this forum. I just thought that I would suggest that UL leave... Last reply: Suzanne Roach, Nov 10, 2022, 12:50 pm |
|
Multizone or Single Zone 62.1 Calculation?NC-v4.1 EQp1: Minimum indoor air quality performanceposted by Jon Silhol on Nov 10, 2022, 12:00 pm
We are designing a TV studio that has two ventilation zones; 1) Stages, studios and 2) Auditorium for seating areas within the TV studio. There is a dedicated single zone, recirculation... |
|
No Cooling Tower SwedenPilot-Credits WEpc94: No Cooling Towerposted by Louise Holmstedt on Nov 10, 2022, 6:55 am
We are pursuing this pilot credit as ACP for a Swedish Project. We Think it is fair that Projects without cooling Towers can achieve the no cooling Tower credit too. |
|
On site or Off site seperationCS-v4 MRc5: Construction and demolition waste managementposted by Andrea Tirao on Nov 10, 2022, 7:59 am
Our project has extensive generation of wastes into different activity zones. For this reason, the Contractor's strategy is to bring the wastes directly off-site comingled and the waste hauler... |
|
Current facilities requirements and operations and maintenance planEBOM-v4.1 EAp1: Energy Efficiency Best Management Practicesposted by Jeanne Perrine on Nov 9, 2022, 11:56 pm
Hello, The project we are working on is a shopping mall aiming to be LEED V4.1 (... |
|
Current facilities requirements (CFR) and operation and maintenance plan (OMP)EBOM-v4.1 EAp1: Energy Efficiency Best Management Practicesposted by Jeanne Perrine on Nov 9, 2022, 11:51 pm
Hello, The project I am working on is a shopping mall (LEED V4.1... |