Topic | Recent |
---|---|
Cities with composting mandates should have streamlined documentationPilot-Credits SSpc129: Comprehensive Compostingposted by Adhamina Rodriguez on Sep 16, 2021, 3:09 am
Like the Alternative Compliance Path for California projects meeting CALGreen code, cities that have composting ordinances in place should have it easier to document this credit. Last reply: Michelle Rosenberger, Jan 31, 2023, 6:17 pm |
|
Do materials in building services count as 'permanently installed'?NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Cecilia Lopez-Cotarelo on Oct 18, 2022, 6:44 am
Do the materials used in the building services count a permanently installed materials when calculating the costs? I am working on a project where services make up a large proportion of the cost... Last reply: Lawrence Rennell, Jan 31, 2023, 5:26 pm |
|
Electrical service requirement for dual port Level 2 chargersCS-v4.1 LTc8: Electric Vehiclesposted by Natalie Terrill on Apr 8, 2022, 12:27 pm
The current language requires a Level 2 charging capacity with 208-240 volts or greater for each space. In the past we've installed conduit and wiring for dual chargers (1 charger using... Last reply: Andrea Vickers, Jan 31, 2023, 10:56 am |
|
Defining a baseline buildingNC-v4.1 MRc1: Building life-cycle impact reductionposted by Cecilia Lopez-Cotarelo on Jan 30, 2023, 12:41 pm
Hello, I am carrying out an LCA for an EU-based project and am confused as to how to establish a baseline to compare improvements in the carbon footprint. The project is currently... Last reply: Camilo Velez, Jan 31, 2023, 10:40 am |
|
Connector Service to other bus routesCS-v4 LTc5: Access to quality transitposted by Nadia Azzam on Jan 30, 2023, 4:09 pm
I am working on a project with one of the stops serving a connector service. This is basically a bus route that connects to other routes. Can we count the other routes it connects to since... |
|
Regarding Energy SimulationNC-v4 EAc2: Optimize Energy Performanceposted by Nagaraj Sankar on Jan 30, 2023, 11:45 pm
In one of our LEED ID+C project, we are having scope of 8th floor and the total floor of the building is 12 floor. Last reply: Marcus Sheffer, Jan 31, 2023, 9:21 am |
|
Receipt Proof RequirementsNC-2009 MRc3: Materials Reuseposted by jupiter luner on Jun 19, 2018, 11:17 am
I wanted to clarify something that I recently heard from a contractor on a LEED project. For a number of the MR credits the receipts are required for the project. Typically, we... Last reply: Andrea Vickers, Jan 31, 2023, 9:20 am |
|
RESORT DEVELOPMENT ON AN ISLANDHospitality-NC-v4 LTc2: Sensitive land protectionposted by Amal Venugopal on Jan 27, 2023, 8:20 am
We are working on a massive resort development project in an natural island which is approved by local goverment to proceed for construction. As per LEED sensitive land prtotection, there... Last reply: hassan izhar, Jan 31, 2023, 8:16 am |
|
DIVERSE USE IN A ISLAND RESORT DEVELOPMENTHospitality-NC-v4 LTc4: Surrounding density and diverse usesposted by Amal Venugopal on Jan 27, 2023, 8:00 am
We are working on a large scale resort development project which is situated on an natural island . The project has more than 8 diverse uses within its boundary. But beyond that there are uses in... Last reply: Amal Venugopal, Jan 31, 2023, 2:50 am |
|
RESORT DEVELOPMENT IN ISLANDHospitality-NC-v4 SSc3: Open spaceposted by Amal Venugopal on Jan 27, 2023, 8:36 am
This is for a resort development project in an island with splendid views . The project has lot of open spaces with both circulation paths and spaces with just sand & view to the beach .... Last reply: Amal Venugopal, Jan 31, 2023, 2:49 am |