Log in
Forum
Topic

portfolio manager space designation

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Pablo Fortunato Suarez on Sep 2, 2010, 11:25 pm

My client's building is predominantly an office building. We have defined other space functions (cafeteria, toilets, meeting rooms, retail spaces, etc) in the Project Info forms. However, the...

Last reply: Tristan Roberts, Feb 23, 2011, 6:46 pm

Growth and Erosion

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Adriana Hansen on Feb 9, 2011, 2:43 pm

We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1?

Last reply: Tristan Roberts, Feb 23, 2011, 6:35 pm

Service Hot Water Efficiency Proposed vs. Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by Paul Bohres on Feb 22, 2011, 5:29 pm

How do you account for the difference in service hot water efficiency from the proposed design to the baseline design if the proposed design is using electric point-of-use water heaters? Is...

Last reply: David Hubka, Feb 23, 2011, 1:56 pm

For my Non US projec the RPs

General forums
posted by Nelina Loiselle on Feb 23, 2011, 12:00 pm

For my Non US projec the RPs show up under the "Add or Remove" credit tab, but on my scorecard they do not show up and I do not get the extra point. Any idea on what to do in order to get the...

Last reply: Susann Geithner, Feb 23, 2011, 1:26 pm

Overlit spaces, IEQc8.1

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Sarah Corbitt on Feb 14, 2011, 2:05 pm

Hi, I've got a 9,400 SF building which serves as the offices for the athletic faculty at a small public university. Two of the offices, both facing north, are overlit when calculated with the...

Last reply: Brian Baewon Koh, Feb 22, 2011, 10:30 pm

Wood nailer on mechanical curbs to be included in FSC calc?

NC-2009 MRc7: Certified Wood
posted by David Hubka on Feb 21, 2011, 11:57 am

Is it required to submit the info on the...

Last reply: Doug Pierce, AIA, Feb 22, 2011, 3:28 pm

Moving Target

EBOM-2009 SSc4: Alternative Commuting Transportation
posted by Mark Westover on Feb 20, 2010, 5:54 pm

Hi. I am a graduate student doing my thesis on the feasablity of making a building LEED compliant. The building is a university building with class rooms. There are 40 permanent staff in the...

Last reply: David Posada, Feb 22, 2011, 12:32 pm

list of required signatories

General forums
posted by Tristan Roberts on Feb 22, 2011, 12:27 pm

Ian, here is a table of LEED"s required signatories compiled by LEEDuser.

Sample of POE survey form?

NC-2009 IEQc7.2: Thermal comfort - verification
posted by Eric JS on Feb 22, 2011, 11:56 am

Dear all,

Do you have any sample of POE survey form that can satisfy this credit?

Thanks and regards

Last reply: Tristan Roberts, Feb 22, 2011, 12:06 pm

Guidance from GBCI rearding multiple buildings:

General forums
posted by Erik Bergstrom on Dec 17, 2009, 2:32 pm

something we highlighted in the LEEDuser enews, and in another forum post. Log in or register to post comments Edwin Wealend Director & Principal Sustainable Design Consultant Cundall HK Ltd. LEEDuser...

Last reply: Guido Petinelli, Feb 22, 2011, 8:43 am