Log in
Forum
Topic

Simplified VRP Calculations

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Natalia Alvarez on Apr 5, 2021, 8:56 pm

We are working on a building built in the 50's, and the project team has elected to follow LEED Interpretation 10472 - Simplified VRP Calculations. Has anyone submitted a project using this...

Last reply: Catarina Costa Goncalves, Jul 3, 2024, 11:20 am

Minimum Indoor Air Quality Calculator

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Gustav Alfaro on Oct 4, 2019, 1:40 am

Hi to all,

I cant find the Minimum Indoor Air Quality Calculator for v4.1 O+M. I noticed there are some differences in the credit intent as compared with the v4 version, for...

Last reply: Pulak Goyal, Jul 2, 2024, 11:44 pm

Welcome to the LEEDuser job board

Help Wanted: LEED-related Jobs
posted by Paula Melton on Mar 2, 2022, 12:29 pm

Hi! This job board is a new feature we're trying out here at LEEDuser. If you're hiring—and we know many of you are looking for help—please feel free to start a new post to let people know about...

Last reply: , Jul 2, 2024, 1:01 pm

Concrete Flooring

NC-v4.1 EQc2: Low-emitting materials
posted by Joseph Snider on Apr 13, 2021, 9:14 am

Selection forum. As far as other basic intro resources, your best source is probably the LEED intro pages on USGBC's website. Good luck! Log in or register to post comments Karl Shelton LEEDuser Basic...

Last reply: L W, Jul 2, 2024, 12:55 pm

Uplight under semi-opaque canopy

NC-v4 SSc6: Light Pollution Reduction
posted by Emily Purcell on Jul 27, 2020, 10:50 am

Hi,

I'm working on a project that is evaluating some different facade lighting and canopy options. We are in LZ2, so we can't use the facade lighting uplight exemption. We are using the...

Last reply: Bill Swanson, Jul 2, 2024, 12:18 pm

Creative & Innovative way in Integrative Process

EBOM-v4 INc1: Innovation
posted by Saiful Nasir on Jul 1, 2024, 9:20 pm

Dear Expert,

We are seeking creative and innovative approaches to enhance the integrative process in the hospital sector. Currently, we involve a collaborative effort from members at...

Measure Outdoor Airflow Rates- Mechanically Ventilated Spaces

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by sebastian castañeda on Jul 24, 2017, 10:57 pm

Is it possible to sustain, as a method of measuring the external air flow, the data recorded in the mechanical design drawings?

Thank you

Last reply: Catarina Costa Goncalves, Jul 2, 2024, 6:54 am

Residential Building

NC-2009 IEQc6.2: Controllability of systems - thermal comfort
posted by Scott Davis on May 25, 2011, 9:59 am

I am trying to achieve this credit for an apartment building. On the LEED v2009 form the residential units were selected as 'Individual' to match the IEQc6.1 form. The LEED Reference Guide says I...

Last reply: herry cane, Jul 2, 2024, 5:56 am

Confirming that ventilation is provided to all spaces

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Rasita Masalskyte on Mar 2, 2017, 4:07 am

Reference Guide states that the most important is to confirm that ventilation air is provided to all occupiable spaces in the building (especially such as circulation, back of house spaces, and...

Last reply: Catarina Costa Goncalves, Jul 2, 2024, 5:35 am

Ice Makers/Energy Star Compliance

NC-v4 WEp2: Indoor water use reduction
posted by Brendan Isard on Apr 18, 2017, 9:39 am

We have a project that uses water cooled ice machine, but the coolant for the system is provided through a refrigerant through a closed loop system. The production for the ice maker also meets...

Last reply: Dave Hubka, Jul 1, 2024, 4:07 pm