Do non-contiguous habitat areas qualify?NC-v4.1 SSc2: Protect or Restore Habitatposted by Jennifer Rennick on Apr 21, 2023, 12:48 pm
We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible. The available planting areas are distributed across the site (a perimeter path,... |
|
Lights mounted under a photovoltaic canopyCS-v4 SSc6: Light Pollution Reductionposted by Samuel Calhoun on Apr 20, 2023, 4:43 pm
Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment? The engineer has selected indoor, vapor... |
|
INpc142 Safety First Pilot Credit Arc Re-EntryEBOM-v4.1 INc1: Innovationposted by Barry Abramson on Apr 20, 2023, 12:46 pm
Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented... |
|
INpc139 Safety First Pilot Credit- Building Water System RecommissioningEBOM-v4.1 INc1: Innovationposted by Barry Abramson on Apr 20, 2023, 12:34 pm
We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic. The Water Management... |
|
Close-out of INpc156- Safety First: Maintenance of HVAC systems during COVID-19Pilot-Credits INpc156: Safety First: Maintenance of HVAC systems during COVID-19posted by Barry Abramson on Apr 20, 2023, 12:18 pm
We pursued this credit for several projects in 2021/2022. It was useful to ensure adequate HVAC maintenance was sustained through the pandemic, but at this point it should be standard practice.... |
|
No issuesPilot-Credits EApc111: Alternative Performance Rating Methodposted by Maureen Mahle on Apr 20, 2023, 12:12 pm
I haven't found any major issue for this credit. |
|
LEED Timeline / ScheduleLEED v4.1 Discussion Forumposted by on Apr 20, 2023, 10:41 am
Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project? Thanks |
|
Advanced Metering for district coolingNC-v4 EAc3: Advanced Energy Meteringposted by Camilo Velez on Apr 12, 2023, 8:34 pm
Hi all, We have encountered a peculiar situation in our project due to a couple of factors:
Last reply: Camilo Velez, Apr 19, 2023, 12:05 pm |
|
How to include existing fixtures in the calculatorNC-v4 WEp2: Indoor water use reductionposted by Hashir Usman on Apr 18, 2023, 5:20 am
Dear all, We have a project which is an extension of an existing industrial facility. The occupants of the new building can access it only by passing through the existing facility's... Last reply: Hashir Usman, Apr 18, 2023, 7:05 am |
|
Post your questions about Passive House herePassive House Discussion Forumposted by Paula Melton on Mar 4, 2019, 9:44 amIntegration Leader MITHUN LEEDuser Basic Member 1 thumbs up May 5, 2021- 1:50 pm Hi Amanda, Just found this Discussion Forum page and your question from 2 years ago. If you, or others, are still looking... Last reply: Brian Cornwell, Apr 17, 2023, 3:58 pm |