Hi all,

We have encountered a peculiar situation in our project due to a couple of factors:

  •  our project is a building located in a campus and receives chilled water for cooling from a District Cooling and since this is an university campus, there is no real charge being incurred from using the chilled water system;
  • due to the location and type of building, the cooling energy consumption is very high compared to the other subsystems when we run our energy model

Because of these 2 factors, when breaking the percentages of energy consumption by the different subsystems, due to the weight of the cooling, all the other subsystems weigh less than 10%.

So my question is: do we have to include the chilled water from the district cooling to calculate the percentages for this credit (which would make the project require only one advanced meter)? Or should we exclude the chilled water from the calculation (which will make several of the remaining subsystems weigh more than 10%, therefore requiring more meters)?

​Thank you,​