STC composite value for gşazed wallNC-v4.1 EQc9: Acoustic performanceposted by murat özdemir on May 26, 2023, 8:16 am
Hi fellow LEED experts, I am a acoustical consultant. I have a K12 project. I checked your apc table. I calculated the wall... |
|
What are the requirements for electrical outlets at the dock doorWarehouses-NC-v4 LTc8: Green vehiclesposted by Aleksandra Suchomska on May 26, 2023, 4:21 am
Hi, Has anyone achieved this credit for Reduced Truck Idling for non-hybrid trucks? How do I adjust the electrical outlets to connect the cab systems to power? Is there such a possibility... |
|
Waste Stream Audit AFTER Performance Period?EBOM-v4 MRp1: Ongoing purchasing and waste policyposted by Heather Enos-Graves on Oct 17, 2022, 4:41 pm
Once the performance period closed for our project, we realized that we did not divert 75% of ongoing waste as required by the prerequisite. Can we perform the alternative waste stream audit now... Last reply: Randi B., May 25, 2023, 4:45 pm |
|
Pilot Credit 87- Verified Construction and Demolition RatesPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Brightworks Sustainability on May 25, 2023, 3:03 pm
This credit was fairly easy to meet but I am wondering if all the C&D processing facilites we used must be verified? Last reply: Joseph Andracchio, May 25, 2023, 3:26 pm |
|
Walk off Mats for Residential Units on ground floorNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Iris Meeker on Dec 7, 2022, 3:37 pm
Our project is a student housing project in which we are certfying under New Construction v4. There are residential units that are on the ground floor with exterior entrances as the main... Last reply: Sara BENLOUBA, May 25, 2023, 3:53 am |
|
Interiors Project, Whole Building, ID&C or BD&CLEED Rating System Selectionposted by Tim Zelazny on Sep 1, 2021, 12:14 pm
Hello - We have a tenant project where the CD set will be the interior fit-out along with new mechanical systems (ex. RTUs) that will serve the tenant space. The tenant is leasing... Last reply: Pongpitch J., May 25, 2023, 3:32 am |
|
Letter from Manufacture for VOC complianceNC-v4 EQc2: Low-emitting materialsposted by Osman Faroq on May 24, 2023, 7:37 am
Dear LEED Users, I have two question: 1. Is a letter from the manufacturer stating... Last reply: Osman Faroq, May 25, 2023, 1:08 am |
|
LEED v4 BD+C- WEp1 Outdoor Water Use Reduction: Calculation of trees areaNC-v4 WEp1: Outdoor water use reductionposted by Ricardo Sá on May 24, 2023, 11:44 am
LEED v4 BD+C NC WE Outdoor Water Use Reduction implies the use of a calculator (Oudoor Water Use Reduction Calculator) that must be used to calculate savings against LEED... Last reply: Emily Purcell, May 24, 2023, 12:08 pm |
|
How contact GBCI for their advice on technical mattersNC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 24, 2023, 4:59 am
Dear everybody, Please, how do you contact... Last reply: Marcus Sheffer, May 24, 2023, 10:08 am |
|
Biophilic design measuresPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Jalime Eskaff on Sep 8, 2022, 4:07 pm
We are currently working on a LEED project that implements strategies mostly materials and patterns that align with the requirements of the strategy and that look for benefits in comfort and... Last reply: Sarah Linke, May 23, 2023, 4:03 pm |