Log in
Forum
Topic

Retail FTE Access

CS-v4 LTc6: Bicycle facilities
posted by Michelle Rosenberger on Dec 5, 2023, 11:34 am

This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities...

Last reply: Dave Hubka, Dec 6, 2023, 3:57 pm

Existing Parking Lot

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Laura Soma on Dec 5, 2023, 12:55 pm

If building next to an existing parking lot, which will serve the new...

Last reply: Dave Hubka, Dec 6, 2023, 3:43 pm

Project phases vs LEED certification approach?

LEED Guidance for Campuses and Multiple Buildings
posted by Ehsan Baharvand on Jul 10, 2016, 3:27 am

Dear all,

I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time):
...

Last reply: Dave Hubka, Dec 6, 2023, 3:31 pm

Energy Metering Displays

NC-v4 EAc3: Advanced Energy Metering
posted by Allison Para on Dec 5, 2023, 12:33 pm

Hello Pros,

I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.

The accountable submetering consumption is for each floor, not...

Last reply: Allison Para, Dec 5, 2023, 3:07 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2: Low-emitting materials
posted by Edgar Arevalo on Sep 29, 2023, 11:46 am

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor, but no...

Last reply: Dave Hubka, Dec 4, 2023, 5:05 pm

Electric vehicle charging station used in demand response strategy

NC-v4 EAc4: Demand response
posted by Martina Salonen on Aug 24, 2018, 9:14 am

vehicle is getting quite common for the demand response programs here, but since I found no mention of this anywhere in the LEED manual nor forum, I wanted to confirm that it is acceptable strategy...

Last reply: Marcus Sheffer, Dec 4, 2023, 3:41 pm

Innovation: PBT source reduction- lead, cadmium and copper

NC-v4 INc1: Innovation
posted by David Dixon on Oct 27, 2017, 11:57 am

the credit does not allow for lead in roofing or flashing.

almost all steel is recycled and the companies report minor lead in the material due to the recycled materials - the one we are...

Last reply: Ann Busker, Dec 4, 2023, 10:23 am

Healthcare-v4.1 MRc6: PBT Source Reduction- Lead, Cadmium, and Copper

Healthcare-v4.1 INc1: Innovation
posted by Ann Busker on Feb 10, 2022, 12:38 pm

Good morning, 

I am looking for examples to send my Plumbing and Electrcial Subcontractors to explain thier process for copper pipe joints and recycling the electrical wires containing...

Last reply: Ann Busker, Dec 4, 2023, 9:50 am

How can a warehouse extension project (with no regularly occupied space) comply with EQp1?

Warehouses-NC-v4 EQp1: Minimum indoor air quality performance
posted by Blake Jackson on Dec 1, 2023, 2:33 pm

I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the...

Last reply: Dave Hubka, Dec 4, 2023, 9:26 am

Increased Ventilation 15% and 30%- does it count as 2 strategies?

CI-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Lidia Johansen on Dec 2, 2023, 7:36 am

Hello

If we achieve increased ventilation by 30% - does it count as 2 strategies (15% and 30%)?

Thanks

Lidia