Topic | Recent |
---|---|
Time for LEED 3.2 to Come to an End IAQSITES Discussion Forumposted by Russ Pellegrino on Jun 8, 2022, 11:23 am
This really isn't a question but just an update... For those of you who have been following me or are needing to do the... |
|
Do off-street parking facilities that are not surface-parking require carpool or car-sharing parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:38 am
Hi, Our project does not have any surface parking (outdoor lots or single-story parking facilities not under habitable buildings). The project does not have any existing parking facilities... |
|
Not enough parking space within a 60-meter range of the entrances to fit all preferred parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:41 am
Hi, The project plans to provide 10% carpool and shared-use vehicle parking; however, only some of the preferred parking can fit into the available lots within a 60-meter range of... |
|
Building Area Method and Space-by-Space Method for lighting power densityNC-v4.1 EAp2: Minimum Energy Performanceposted by Ying Lindsey on Jun 6, 2022, 8:11 pm
Dear All, Last reply: Ying Lindsey, Jun 8, 2022, 1:18 am |
|
Can warehousing ramp lighting for transportation exempt from Light Pollution ReductionCS-v4 SSc6: Light Pollution Reductionposted by yingling guan on Jul 6, 2020, 4:13 am
There is a warehouse building project, with outdoor transport ramp beside buildings. Many exterior lighting designed on the ramp for directional and marker lighting for transportation, are they... Last reply: yingling guan, Jun 7, 2022, 11:02 pm |
|
Entire building vs tenant space recyclables collectionCI-v4.1 MRp1: Storage and Collection of Recyclablesposted by Neumann Monson on Jun 3, 2022, 6:59 pm
The credit language says the project needs to provide dedicated areas for collection and storage for the "entire building". If a project is a tenant space within a larger existing mixed use... Last reply: Jim Nicolow, Jun 7, 2022, 7:21 pm |
|
Thermal comfort controlsNC-v4 EQc5: Thermal comfortposted by Alexandre DENEUVILLE on May 16, 2022, 5:38 am
Hello, For the credit Thermal comfort, what alternative can we have other than remote controls to regulate thermal comfort in spaces where there is a significant number of occupants such... Last reply: emily reese moody, Jun 7, 2022, 7:20 pm |
|
Baseline System TypeHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Jun 7, 2022, 10:35 am
Hi all, We are currently working on a project which is a building with two levels - Ground floor level and Level 01. Level 01 is 1,000 m2 and consists of hotel rooms, whereas Ground floor... Last reply: Marcus Sheffer, Jun 7, 2022, 3:22 pm |
|
O’Brien360 is looking for another exceptional colleague to join our commercial consulting team!Help Wanted: LEED-related Jobsposted by Elizabeth Powers on Apr 1, 2022, 3:34 pm
Commercial Green Building Rating System Project Assistant O’Brien360 is looking for another exceptional colleague to join our commercial consulting team. We are seeking a project assistant... Last reply: Lynnel Hampton-Bott, Jun 7, 2022, 1:33 pm |
|
CO2 monitor in a boothCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Alicja Bieszyńska on Nov 4, 2017, 8:06 am
Hello! In our office project we have several phone booths that will be used only for making phonecalls. They are enclosed small spaces (1,5x1,5m) with a table and a chair. Shall we treat... Last reply: Nadia Bini, Jun 6, 2022, 8:02 pm |