Log in
Forum
Topic

Emergency generator building

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Priscillia Champagne on Oct 8, 2019, 1:06 am

I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital). In the same scope of...

Last reply: Priscillia Champagne, May 30, 2022, 9:07 am

New addition with separate air distribution systems also feeding renovation portion of existing hospital

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Priscillia Champagne on May 30, 2022, 9:02 am

We are planning to register a new project for LEED certification, but we need to make sure that we can comply with the minimum program requirement #2 beforehand. The specific language that is...

Vinyl committed to sustainable developments Certification

NC-v4.1 EQc2: Low-emitting materials
posted by Francesco Lupoi on May 30, 2022, 7:20 am

Good morning everyone!

I'm certifying a LEED Hotel, someone knows if the Vinyl committed to sustainable developments Certification for a wallpaper contributes to one of the LEED MR credits...

Floor tile system components

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Monica Verastegui on May 22, 2020, 6:38 pm

Our project has a porcelain tile floor with an anti-fracture and waterproofing membrane under it. Does the membrane product need to meet requirements for IEQc4.3?

Last reply: Cecile de Villemeur, May 27, 2022, 12:55 pm

SCAQMD Rule 1168 (Amended October 6, 2017)

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Wai Hoong Yap on Sep 23, 2021, 9:16 pm

I have a silicone sealant which is classify as "All Other Architectural Sealants", which...

Last reply: Cecile de Villemeur, May 27, 2022, 12:07 pm

Commissioning on C&S building not complete because of push back

CS-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Edgar Arevalo on May 26, 2022, 6:02 pm

My team is having an issue with the mechanical contractor who installed lab exhaust fans in the buildings.  The...

Last reply: Brian Salazar, May 27, 2022, 10:26 am

Open fireplaces

NC-v4 EQp1: Minimum indoor air quality performance
posted by Cristina Florit on Jan 24, 2020, 8:43 am

I am working in a hotel project where open fireplaces are being considered.

As all fireplaces in residential projects must have solid glass enclosures, I am wondering if this requirement...

Last reply: Panagiotis Paliouras, May 26, 2022, 10:42 am

GreenGuard certification

CS-v4.1 EQc2: Low-emitting materials
posted by Allen Cornett on May 25, 2022, 3:51 pm

I have never used a GreenGuard certificate before.  The Maximum Allowable Predicted Concentrations are higher than those in the GreenGuard Gold certification.  Is the GreenGuard certification...

Last reply: Emily Purcell, May 26, 2022, 10:15 am

Using Autocase to document SSpc113

Pilot-Credits SSpc113: Informing Design Using Triple Bottom Line Analysis
posted by Jennifer Wehling on Apr 27, 2021, 7:05 pm

We used Autocase to document this pilot credit. It was a good process, though we needed lots of help from our account rep, who was thankfully willing to walk us through the process.  We found...

Last reply: Jill Kurtz, May 25, 2022, 2:56 pm

Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Amgad Khattab on May 25, 2022, 11:50 am

Is it applicable for a historic wall project to obtain LEED New Construction BD+C Certification?

The project consist of constructing a new wall with multiple entry gates. Every gate has...