Log in
Forum
Topic

Pilot Credit INpc155

Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Control
posted by Roxanne Button on Jul 12, 2021, 4:13 pm

Has anyone attempted this Pilot Credit yet?  Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requirements...

Last reply: Michelle Halle Stern, Jun 21, 2024, 10:53 am

Can the Shower Rooms be included in the Tenant's Sale Lease Agreement?

CS-v4 LTc6: Bicycle facilities
posted by Nadia Garcia on Apr 18, 2024, 3:59 pm

Hello LEED community,

I'm seeking clarification regarding the Bicycle Facilities credit requirements in LEED v4 BD+C: Core & Shell, specifically regarding the inclusion of shower...

Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:42 am

If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awar

NC-v4 WEc1: Outdoor water use reduction
posted by Nandan Tavkar on Jun 19, 2024, 5:39 am

If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm 

Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:40 am

LEED PC 66 Community Contaminant Prevention

Pilot-Credits EApc66: Community contaminant prevention - airborne releases
posted by Amanda Brathwaite on Apr 16, 2015, 4:55 pm

There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that...

Last reply: Michelle Halle Stern, Jun 21, 2024, 10:34 am

Recycled Content Report (Post-Consumer & PreConsumer)

NC-v4.1 MRc3: Sourcing of Raw Materials
posted by Mu'ath Ad on Jun 7, 2024, 2:02 pm

Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons.

...

Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:34 am

Core and Shell Office

Pilot-Credits SSpc129: Comprehensive Composting
posted by Michelle Rosenberger on Jun 20, 2024, 3:18 pm

Signage, receptacles and outreach education are very different with a core and shell building with no internal tenants or project management in place. Since composting is mandated in our city and...

Commercial Dishwasher in office kitchen

CI-v4 WEp1: Indoor water use reduction
posted by Rachael McGinley on Apr 30, 2024, 9:42 am

Hi, 
I have a project where the client wants to specify a commercial-style dishwasher rather than a domestic-scale one. There doesn't seem to be guidance for this within the LEED-CI credit...

Last reply: emily reese moody, Jun 20, 2024, 12:27 am

Low Mercury Lamps

NC-2009 IDc1: Innovation in Design
posted by Michelle Rosenberger on May 18, 2017, 2:56 pm

It has always been my understanding, underscored by the LEEDuser LEED...

Last reply: Justin Southwick, Jun 19, 2024, 5:43 pm

Snow Melt

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Elizabeth Felder on Jul 29, 2014, 9:37 am

We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown. Is it assumed that this product is non-...

Last reply: Kristina K, Jun 19, 2024, 4:27 pm

Concrete Flooring

NC-v4.1 EQc2: Low-emitting materials
posted by Joseph Snider on Apr 13, 2021, 9:14 am

Selection forum. As far as other basic intro resources, your best source is probably the LEED intro pages on USGBC's website. Good luck! Log in or register to post comments ...

Last reply: Nadav Malin, Jun 19, 2024, 11:06 am