Topic | Recent |
---|---|
Walk off Mats for Residential Units on ground floorNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Iris Meeker on Dec 7, 2022, 3:37 pm
Our project is a student housing project in which we are certfying under New Construction v4. There are residential units that are on the ground floor with exterior entrances as the main... Last reply: Sara BENLOUBA, May 25, 2023, 3:53 am |
|
Interiors Project, Whole Building, ID&C or BD&CLEED Rating System Selectionposted by Tim Zelazny on Sep 1, 2021, 12:14 pm
Hello - We have a tenant project where the CD set will be the interior fit-out along with new mechanical systems (ex. RTUs) that will serve the tenant space. The tenant is leasing... Last reply: Pongpitch J., May 25, 2023, 3:32 am |
|
Letter from Manufacture for VOC complianceNC-v4 EQc2: Low-emitting materialsposted by Osman Faroq on May 24, 2023, 7:37 am
Dear LEED Users, I have two question: 1. Is a letter from the manufacturer stating... Last reply: Osman Faroq, May 25, 2023, 1:08 am |
|
LEED v4 BD+C- WEp1 Outdoor Water Use Reduction: Calculation of trees areaNC-v4 WEp1: Outdoor water use reductionposted by Ricardo Sá on May 24, 2023, 11:44 am
LEED v4 BD+C NC WE Outdoor Water Use Reduction implies the use of a calculator (Oudoor Water Use Reduction Calculator) that must be used to calculate savings against LEED... Last reply: Emily Purcell, May 24, 2023, 12:08 pm |
|
How contact GBCI for their advice on technical mattersNC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 24, 2023, 4:59 am
Dear everybody, Please, how do you contact... Last reply: Marcus Sheffer, May 24, 2023, 10:08 am |
|
Biophilic design measuresPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Jalime Eskaff on Sep 8, 2022, 4:07 pm
We are currently working on a LEED project that implements strategies mostly materials and patterns that align with the requirements of the strategy and that look for benefits in comfort and... Last reply: Sarah Linke, May 23, 2023, 4:03 pm |
|
[Pilot] Enhanced Acoustical Performance- Exterior Noise ControlCI-v4 INc1: Innovationposted by Cecilia Esparza on May 23, 2023, 11:14 am
For residential projects, the Pilot credit for Exterior Noise Control requires a "maximum interior noise level (Lmax) or 45... |
|
Glare control: UGRSchools-NC-v4.1 EQc6: Interior lightingposted by Alicia Davila on May 23, 2023, 7:32 am
For glare control one of the options, to obtain the credit, is having a value of <19 UGR, but is this value an average of the full calculation or it is the maximum value? As an example... |
|
Inconsistent ITE Referenced Documentation, Which to use??NC-v4 LTc7: Reduced parking footprintposted by Brian Salazar on May 9, 2023, 10:25 am
Hello! The LEED Credit web site lists the hardly legible ITE parking ratios table 3rd Edition as a resource for determining baseline ratios. This site lists a different table , 5th Edition, with... Last reply: Edgar Arevalo, May 22, 2023, 2:47 pm |
|
IP Worksheet- Very confusing languageNC-v4 IPc1: Integrative processposted by Maria Grimm on Jan 23, 2019, 2:55 pm
I'm working on a project where we completed a very thorough IP analysis during concept design. I am finding now, however, that filling out the IP worksheet is extremely painful due to very... Last reply: Nadia Azzam, May 22, 2023, 2:20 pm |