Log in
Forum
Topic

Walk off Mats for Residential Units on ground floor

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Iris Meeker on Dec 7, 2022, 3:37 pm

Our project is a student housing project in which we are certfying under New Construction v4. There are residential units that are on the ground floor with exterior entrances as the main...

Last reply: Sara BENLOUBA, May 25, 2023, 3:53 am

Interiors Project, Whole Building, ID&C or BD&C

LEED Rating System Selection
posted by Tim Zelazny on Sep 1, 2021, 12:14 pm

Hello -

We have a tenant project where the CD set will be the interior fit-out along with new mechanical systems (ex. RTUs) that will serve the tenant space.

The tenant is leasing...

Last reply: Pongpitch J., May 25, 2023, 3:32 am

Letter from Manufacture for VOC compliance

NC-v4 EQc2: Low-emitting materials
posted by Osman Faroq on May 24, 2023, 7:37 am

Dear LEED Users, 

I have two question:

1. Is a letter from the manufacturer stating...

Last reply: Osman Faroq, May 25, 2023, 1:08 am

LEED v4 BD+C- WEp1 Outdoor Water Use Reduction: Calculation of trees area

NC-v4 WEp1: Outdoor water use reduction
posted by Ricardo Sá on May 24, 2023, 11:44 am

LEED v4 BD+C NC WE Outdoor Water Use Reduction implies the use of a calculator (Oudoor Water Use Reduction Calculator) that must be used to calculate savings against LEED...

Last reply: Emily Purcell, May 24, 2023, 12:08 pm

How contact GBCI for their advice on technical matters

NC-v4 IPc1: Integrative process
posted by Sara BENLOUBA on May 24, 2023, 4:59 am

Dear everybody, 

Please, how do you contact...

Last reply: Marcus Sheffer, May 24, 2023, 10:08 am

Biophilic design measures

Pilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
posted by Jalime Eskaff on Sep 8, 2022, 4:07 pm

We are currently working on a LEED project that implements strategies mostly materials and patterns that align with the requirements of the strategy and that look for benefits in comfort and...

Last reply: Sarah Linke, May 23, 2023, 4:03 pm

[Pilot] Enhanced Acoustical Performance- Exterior Noise Control

CI-v4 INc1: Innovation
posted by Cecilia Esparza on May 23, 2023, 11:14 am

For residential projects, the Pilot credit for Exterior Noise Control requires a "maximum interior noise level (Lmax) or 45...

Glare control: UGR

Schools-NC-v4.1 EQc6: Interior lighting
posted by Alicia Davila on May 23, 2023, 7:32 am

For glare control one of the options, to obtain the credit, is having a value of <19 UGR, but is this value an average of the full calculation or it is the maximum value? 

As an example...

Inconsistent ITE Referenced Documentation, Which to use??

NC-v4 LTc7: Reduced parking footprint
posted by Brian Salazar on May 9, 2023, 10:25 am

Hello! The LEED Credit web site lists the hardly legible ITE parking ratios table 3rd Edition as a resource for determining baseline ratios.  This site lists a different table , 5th Edition, with...

Last reply: Edgar Arevalo, May 22, 2023, 2:47 pm

IP Worksheet- Very confusing language

NC-v4 IPc1: Integrative process
posted by Maria Grimm on Jan 23, 2019, 2:55 pm

I'm working on a project where we completed a very thorough IP analysis during concept design. I am finding now, however, that filling out the IP worksheet is extremely painful due to very...

Last reply: Nadia Azzam, May 22, 2023, 2:20 pm