What are the requirements for electrical outlets at the dock door

Warehouses-NC-v4 LTc8: Green vehicles
posted by Aleksandra Suchomska on May 26, 2023, 4:21 am

Hi,

Has anyone achieved this credit for Reduced Truck Idling for non-hybrid trucks? How do I adjust the electrical outlets to connect the cab systems to power? Is there such a possibility...

Waste Stream Audit AFTER Performance Period?

EBOM-v4 MRp1: Ongoing purchasing and waste policy
posted by Heather Enos-Graves on Oct 17, 2022, 4:41 pm

Once the performance period closed for our project, we realized that we did not divert 75% of ongoing waste as required by the prerequisite. Can we perform the alternative waste stream audit now...

Last reply: Randi B., May 25, 2023, 4:45 pm

Pilot Credit 87- Verified Construction and Demolition Rates

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Brightworks Sustainability on May 25, 2023, 3:03 pm

This credit was fairly easy to meet but I am wondering if all the C&D processing facilites we used must be verified?

Last reply: Joseph Andracchio, May 25, 2023, 3:26 pm

Walk off Mats for Residential Units on ground floor

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Iris Meeker on Dec 7, 2022, 3:37 pm

Our project is a student housing project in which we are certfying under New Construction v4. There are residential units that are on the ground floor with exterior entrances as the main...

Last reply: Sara BENLOUBA, May 25, 2023, 3:53 am

Interiors Project, Whole Building, ID&C or BD&C

LEED Rating System Selection
posted by Tim Zelazny on Sep 1, 2021, 12:14 pm

Hello -

We have a tenant project where the CD set will be the interior fit-out along with new mechanical systems (ex. RTUs) that will serve the tenant space.

The tenant is leasing...

Last reply: Pongpitch J., May 25, 2023, 3:32 am

Letter from Manufacture for VOC compliance

NC-v4 EQc2: Low-emitting materials
posted by Osman Faroq on May 24, 2023, 7:37 am

Dear LEED Users, 

I have two question:

1. Is a letter from the manufacturer stating...

Last reply: Osman Faroq, May 25, 2023, 1:08 am

LEED v4 BD+C- WEp1 Outdoor Water Use Reduction: Calculation of trees area

NC-v4 WEp1: Outdoor water use reduction
posted by Ricardo Sá on May 24, 2023, 11:44 am

LEED v4 BD+C NC WE Outdoor Water Use Reduction implies the use of a calculator (Oudoor Water Use Reduction Calculator) that must be used to calculate savings against LEED...

Last reply: Emily Purcell, May 24, 2023, 12:08 pm

How contact GBCI for their advice on technical matters

NC-v4 IPc1: Integrative process
posted by Sara BENLOUBA on May 24, 2023, 4:59 am

Dear everybody, 

Please, how do you contact...

Last reply: Marcus Sheffer, May 24, 2023, 10:08 am

Biophilic design measures

Pilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
posted by Jalime Eskaff on Sep 8, 2022, 4:07 pm

We are currently working on a LEED project that implements strategies mostly materials and patterns that align with the requirements of the strategy and that look for benefits in comfort and...

Last reply: Sarah Linke, May 23, 2023, 4:03 pm

[Pilot] Enhanced Acoustical Performance- Exterior Noise Control

CI-v4 INc1: Innovation
posted by Cecilia Esparza on May 23, 2023, 11:14 am

For residential projects, the Pilot credit for Exterior Noise Control requires a "maximum interior noise level (Lmax) or 45...