Log in
Forum
Topic

Shower column kit with 3 different features and water consumptions.

NC-v4 WEp2: Indoor water use reduction
posted by Olga Yuil on Mar 30, 2020, 10:42 pm

For showers in a new Project a shower column kit will be installed and it includes: a showerhead, a hose and a faucet.

(Example: Kohler Singulier K-72672T-C4-CP)

Each of...

Last reply: emily reese moody, Jul 20, 2023, 4:23 pm

Reclaimed water irrigation service metering- can this effectively fulfill quota of (2) minimum water subsystems?

NC-v4 WEc4: Water metering
posted by Joanna Switzer on Feb 14, 2018, 9:08 am

Step 2 of the Step-by-Step BD+C Reference guidance notes...."if the team is using...

Last reply: Kristen Magnuson, Jul 20, 2023, 2:27 pm

No landscape area- Is this credit not applicable?

NC-v4 WEp1: Outdoor water use reduction
posted by Sonali Rawat on May 3, 2023, 2:13 am

Hi,

For one of our projects in the MENA region, there is no landscape area at all due to the nature of the project. Is this credit not applicable in that case and we are not eligible for...

Last reply: emily reese moody, Jul 20, 2023, 1:58 pm

LEED v4 Waste Monitoring unit of measurement in Truck Load

CS-v4 MRc5: Construction and demolition waste management
posted by Ronnel Flores on Mar 11, 2020, 8:41 pm

Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume? Shall we determine just an average volume for one truck load in any of the units in the calculator...

Last reply: Chris Leoni, Jul 20, 2023, 11:19 am

Waste Manangement

Warehouses-NC-v4.1 MRc5: Construction and demolition waste management
posted by Joseph Snider on Jul 20, 2023, 10:54 am

Working on warehouses in areas that do not have many options for recycling.  Just to be clear, can you do just the waste reduction option of <10 lbs/SF and if so, that is all you put in the...

Gather one year waste data or do a waste analysis/audit?

EBOM-v4.1 MRp3: Waste Performance
posted by shashank gangil on Sep 16, 2022, 8:56 pm

Dear,

The language of LEED V4.1 says that project either collect one year waste data or waste analysis. Does it means, the waste analysis is an audit which can be done based on less then 1...

Last reply: Randi B., Jul 19, 2023, 8:36 pm

Changing structural systems between the baseline and proposed design

NC-v4 MRc1: Building life-cycle impact reduction
posted by Ahmed Abd El Fattah on Apr 5, 2023, 12:05 am

Hello

Is changing from concrete...

Last reply: Afogreen Build, Jul 19, 2023, 12:34 am

Cooling Tower is used for process water (Factory project)

NC-v4 WEc3: Cooling tower water use
posted by Youssef Hisham on Mar 1, 2023, 5:54 am

We are in a factory project and the cooling tower is used for the process water for the factory equipment. So, Does the cooling tower credit requirement applies to our project ?

Last reply: Afogreen Build, Jul 19, 2023, 12:29 am

Education Programs required to be about the LEED building

NC-2009 IDc1: Innovation in Design
posted by Lawrence Lile on Jun 4, 2015, 1:44 pm

You can have a wonderful environmental education program, but if it doesn't talk about the LEED building, it will get rejected. Just had a long discussion with a LEED reviewer after a denied...

Last reply: Sarah Wood, Jul 18, 2023, 9:29 pm

MRc2 BPDO EPD Option 2 Multi Attribute Optimization

NC-v4.1 MRc2: Environmental Product Declarations
posted by Sarah Linke on Feb 24, 2021, 3:24 pm

Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows: 

Owens Corning (...

Last reply: Sarah Linke, Jul 18, 2023, 1:20 pm