Topic | Recent |
---|---|
Electric vehicles charging stationsCS-v4 EAc2: Optimize Energy Performanceposted by Rihab Joucht on Aug 25, 2023, 8:56 am
I want to make sure if we include the EV charging in Energy Model ? As mentionned in 10499 - EV Charging in Model | U.S. Green Building Council (... Last reply: Marcus Sheffer, Sep 1, 2023, 1:35 pm |
|
EPD Option 2: OptimizationNC-v4.1 MRc2: Environmental Product Declarationsposted by Jane Rohde on Sep 1, 2023, 12:57 pm
For this portion of the credit, the Baseline Documentation includes Industry Wide Type III EPDs Reduction in Embodied Carbon |
|
Interpreting "medical intervention" and "direct medical care"Healthcare-v4 SSc7: Places of respiteposted by on Sep 1, 2023, 10:44 am
We are working on a Mental Health facility and we are curiosus about how to interpert "medical intervention" and "direct medical care: "The area is located where no medical intervention... |
|
VOC content for Insulation foam rolls with self adhesive.NC-v4.1 EQc2: Low-emitting materialsposted by Ngo Ha on Dec 16, 2020, 4:33 am
Hi All, Last reply: Ralph Bicknese, Sep 1, 2023, 11:04 am |
|
Light Pollution for Large Project BoundariesWarehouses-EBOM-v4.1 SSc3: Light Pollution Reductionposted by Rick Fox on Aug 18, 2023, 10:31 am
I manage a 550k square foot warehouse operating at 24/7. All of our building lights, are LED and point down at the ground. Our pole lights are LED also and point down at a 45 degree angle to... Last reply: Bill Swanson, Sep 1, 2023, 8:57 am |
|
Location of short-term bicycle parkingsCS-v4 LTc6: Bicycle facilitiesposted by Marine Petrosyan on Sep 1, 2023, 8:25 am
Hi, All! The architect has designed a great part of the short-term bicycle parkings inside the building, mostly in the territory of car parkings, which form the underground floors of the... |
|
Demand Response- Switch credit to LEED v4.1NC-v4 EAc4: Demand responseposted by Caterina Panteghini on Aug 31, 2023, 11:51 am
Hello, everyone. I have a question about... Last reply: Marcus Sheffer, Aug 31, 2023, 4:43 pm |
|
Changing signature on LEED Agreement.LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Marine Petrosyan on Aug 31, 2023, 5:56 am
Hi, All! Help, please. We are planning to change the representative user on LEED Online, who has signed the certification in the name of the owner. The platform says to... Last reply: Ralph Bicknese, Aug 31, 2023, 4:12 pm |
|
Concrete Curing CompoundsNC-v4.1 EQc2: Low-emitting materialsposted by Nohemi Mena on Aug 30, 2023, 11:13 am
Hi!! Im currently working in a project pursuing LEM v4.1 under BD+C New Construction rating, does anybody know if for products like concrete curing compounds, should be registered in the... Last reply: Umesh Atre, Aug 31, 2023, 3:38 pm |
|
Ozone Testing ProtocolCI-v4.1 EQc4: Indoor air quality assessmentposted by David MacLean on Aug 31, 2023, 1:16 pm
Is the OSHA ID-214 testing method a USGBC / GBCI approved / accepted testing protocol for Ozone. |