Topic | Recent |
---|---|
Healthcare-v4.1 MRc6: PBT Source Reduction- Lead, Cadmium, and CopperHealthcare-v4.1 INc1: Innovationposted by Ann Busker on Feb 10, 2022, 12:38 pm
Good morning, I am looking for examples to send my Plumbing and Electrcial Subcontractors to explain thier process for copper pipe joints and recycling the electrical wires containing... Last reply: Ann Busker, Dec 4, 2023, 9:50 am |
|
How can a warehouse extension project (with no regularly occupied space) comply with EQp1?Warehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Blake Jackson on Dec 1, 2023, 2:33 pm
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the... Last reply: Dave Hubka, Dec 4, 2023, 9:26 am |
|
Increased Ventilation 15% and 30%- does it count as 2 strategies?CI-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Lidia Johansen on Dec 2, 2023, 7:36 am
Hello If we achieve increased ventilation by 30% - does it count as 2 strategies (15% and 30%)? Thanks Lidia |
|
LEED certification for open spacesLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sergio Acevedo on Dec 1, 2023, 3:34 pm
We would like our expansion project to be LEED certified. There will be no physical separation between the existing building and the extension (no walls). In fact, the space will be... |
|
Does adding "green, pool and EV's" to parking onsite, yet outside our LEED Boundary, comply with these credits' intent?Warehouses-NC-v4 LTc8: Green vehiclesposted by Blake Jackson on Dec 1, 2023, 2:50 pm
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the... |
|
Commissioning AuthorityCI-v4 EAp1: Fundamental commissioning and verificationposted by padma priya on Dec 1, 2023, 1:46 am
Commissioning Authority - Please clarify this query. Should... |
|
Infiltration rate @ 75 Pa (ASHRAE 2016) vs. 4 Pa / 50 Pa (Design Builder Software)NC-v4.1 EAc2: Optimize Energy Performanceposted by Ziad Zeitoun on Nov 28, 2023, 11:18 am
Hello, ASHRAE 2016 specifies the... Last reply: Marcus Sheffer, Dec 1, 2023, 9:44 am |
|
Bicycle-credit doubtsNC-v4 LTc6: Bicycle facilitiesposted by Deva venkat on Nov 14, 2023, 5:40 am
Hi team, i have doubts in bicycle credit.my project location is Bangladesh government using common road for two wheeler and four wheelers. Here how i get points in bicycle credit. Last reply: Shijie Wang, Nov 30, 2023, 12:10 pm |
|
NSF/ANSI 140 Carpet- Platinum corticateNC-v4.1 EQc2: Low-emitting materialsposted by Osman Faroq on Nov 13, 2023, 3:25 am
Dears, is NSF/ANSI 140 Carpet - Platinum certificate approved and considered in Low Emitting Credit? I've looked at the certification and there is no reference to CDPH standards. ... Last reply: Patty Karapinar, Nov 29, 2023, 3:52 pm |
|
"Vertical chase" meaningNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Noriko Nagazumi on Aug 14, 2014, 9:00 pm
The term "vertical chase" is present on the definition of "differential air pressure". Does "vertical chase" refers to pipe shafts adjacent to the room or to the ceiling plenum? The... Last reply: Sana Hafsa, Nov 29, 2023, 10:10 am |