Topic | Recent |
---|---|
Lighting Power DensityCS-2009 SSc8: Light Pollution Reductionposted by Tom Fik on Aug 6, 2010, 3:22 pm
Is there maximum allowable... |
|
Building Area Method Compliance PathCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Andreas M. Roessler on Aug 6, 2010, 8:13 am
We've got a question concerning "Building Area Method Compliance Path" in the Chapter 9: "Lighting", ASHRAE Standard 90.1-2007. Appendix G: Performance Rating Method involves the Table G3.... Last reply: Dane Sanders, Aug 6, 2010, 2:02 pm |
|
Exterior WindowsCI-2009 IEQc8.1: Daylight and views - daylightposted by kelvin duen on Jul 29, 2010, 11:57 am
Our Project's exterior windows were installed prior to moving into the building. The make and model of the windows are thus unknow. What value do I use for the... Last reply: Jill Perry, PE, Aug 6, 2010, 1:10 pm |
|
EQ Credit 8.1 Prescriptive Method for Top LightingNC-2009 IEQc8.1: Daylight and views - daylightposted by Kendal Neitzke on Aug 6, 2010, 10:16 am
I am working through the prescriptive calculations for daylighting for a 64,312 sq ft open floor manufacturing facility where the exposed roof deck is 41'-6" above the finished floor. This one... Last reply: Eddy Santosa, Aug 6, 2010, 11:30 am |
|
Using different metrics (volume and weight) for MR: Solid WasteEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Andrew Barnes on Aug 6, 2010, 9:03 am
In LEED EB:O&M, MR credits 7-9, measurment and documentation of on-going consumable, durable goods, etc. is required during the performance period. My understanding is that this is to be... Last reply: Dan Ackerstein, Aug 6, 2010, 11:12 am |
|
kitchen facilities and LEED rating system selectionGeneral forumsposted by Tristan Roberts on Aug 5, 2010, 8:43 pm
Interesting question. If this were only about selecting a LEED rating system, I would say that it falls under LEED for New Construction, not LEED for Homes, due to the lack of kitchen facilities... Last reply: Larry Jones, Aug 6, 2010, 9:12 am |
|
Existing AHU serves more than the LEED tenant space- what to do?CI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Philip Herriges on Aug 5, 2010, 11:23 am
The LEED CI Addenda dated July 19, 2010 modifies the third bullet point under EQc5 as follows: Replace the text of the third bullet on page 359 with the following: Last reply: Philip Herriges, Aug 6, 2010, 7:45 am |
|
LEED-CI credits on a LEED-EBOM projectGeneral forumsposted by Tristan Roberts on Aug 6, 2010, 12:32 am
I'm actually not sure you're on the right track. |
|
IEQc5: High-Volume Copy/Print/Fax AreasNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Sara LeMone on Aug 5, 2010, 5:03 pm
Hypothetically, suppose you will have 800 employees who print/fax/copy anywhere between 100-125 pages each, every month. You also have 3 copy rooms... That's a total of 80,000-100,000 copies/... Last reply: Tristan Roberts, Aug 6, 2010, 12:24 am |
|
Existing TreesEBOM-2009 SSc5: Site development - protect or restore open habitatposted by Geoffrey Tomlinson on Jun 24, 2010, 10:05 pm
How are existing trees counted. We have several old large trees on our site that are not native, and loathe the thought of cutting them down to satisfy this credit. Is the size of their canopy... Last reply: Dan Ackerstein, Aug 5, 2010, 11:49 pm |