Topic | Recent |
---|---|
Natural Ventilation- Single SpaceNC-2009 IEQp1: Minimum indoor air quality performanceposted by Omer Moltay on Mar 11, 2011, 11:06 am
Almost all the spaces in our building is mechanically ventilated, except the entrance lobby which receives outside air through revolving doors. The revolving door opening area and the 8 m. rule... Last reply: Tristan Roberts, Apr 23, 2011, 8:58 pm |
|
Reuse of building structureNC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roofposted by Adriana Hansen on Apr 11, 2011, 2:00 pm
Hello, We are working with a major renovation in a stadium. The huge structural external columms will be maintained (100%), but the floor slabs will be demolished, except for some parts of... Last reply: Tristan Roberts, Apr 23, 2011, 8:57 pm |
|
ASHRAE 62.1-2010NC-2009 IEQp1: Minimum indoor air quality performanceposted by Andreas Hintz on Apr 18, 2011, 11:47 am
For this prerequisite it is necessary that the ASHRAE Standard 62.1-2007 is met. But what about the newest version ASHRAE Standard 62.1-2010? Does that one count as well? Thanks for your... Last reply: Tristan Roberts, Apr 23, 2011, 8:49 pm |
|
Irrigation- Baseline caseNC-2009 WEc1: Water Efficient Landscapingposted by Maya Karkour on Mar 7, 2011, 11:52 am
Hello, The guidance is not really clear on what to put in the baseline case. It only says that we need to specify typical landscaping practices. Do we need to document these... Last reply: Tristan Roberts, Apr 23, 2011, 6:01 pm |
|
LEED Documentation- is it required for this pointNC-2009 SSc6.2: Stormwater design - quality controlposted by Kelley Howell on Apr 7, 2011, 5:45 pm
Our project approach to this point is pretty straightforward. We are using a water quality... Last reply: Tristan Roberts, Apr 23, 2011, 5:48 pm |
|
AGMBC 2010- Multi-building industrial plant certificationGeneral forumsposted by Daniel Brum on Apr 10, 2011, 7:11 pm
Hi there. I am working on an industrial plant 2009 LEED-NC/AGMBC 2010 certification. The plant consists of 9 building (the main production building and 8 buildings associated with its normal... Last reply: Tristan Roberts, Apr 23, 2011, 5:41 pm |
|
LEED CS v3- require actual invoices?NC-2009 MRc4: Recycled Contentposted by eileen hughes on Apr 19, 2011, 5:39 am
General Contractor has provided LEED submittal material form but the backup information ranges from a job specific letter from the manufacturer, to information from a manufacturer web site. Is... Last reply: Tristan Roberts, Apr 23, 2011, 4:25 pm |
|
100% recycling rate claimsNC-2009 MRc2: Construction Waste Managementposted by Yancy Wright on Jan 13, 2010, 5:38 pm
I often get reports from recycling facilities taking dedicated loads of concrete,... Last reply: Tristan Roberts, Apr 23, 2011, 3:52 pm |
|
Minumum sight line height in existing buildingNC-2009 IEQc8.1: Daylight and views - daylightposted by Susan Di Giulio on Mar 17, 2011, 8:56 pm
I think I know the answer to this, but it's not the answer I want, so I'll throw it out there: Last reply: Tristan Roberts, Apr 23, 2011, 3:48 pm |
|
MRc7 collecting documentationSchools-2009 MRc7: Certified Woodposted by Brian Smith on Sep 28, 2010, 10:59 am
Does the value of this credit exclude labor, hardware, delivery when quantifying casework, stackables, etc. Does the value of this credit include all paper based products, for instance;... Last reply: Tristan Roberts, Apr 23, 2011, 3:22 pm |