Epoxy floor coatingNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Jana Schulz on Aug 23, 2010, 7:11 pm
Do you know what are the requirements to meet if I have an epoxy floor in my project? Thanks! Last reply: Petra Hajná, Nov 16, 2011, 8:00 am |
|
Cancellation due to inactivityGeneral forumsposted by Agustina Galli on Nov 9, 2011, 4:13 pm
Hello! Last reply: Emily Catacchio, Nov 15, 2011, 8:39 pm |
|
IAQ managent- real live picturesCI-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Susann Geithner on Nov 15, 2011, 5:48 pm
Here are some real live applications for... |
|
UNUSUAL AND UNIQUE PROCESS LOADNC-2009 EAp2: Minimum Energy Performanceposted by Vindio Corro on Nov 15, 2011, 1:51 pm
We are working in a Project which is a unique green energy research facility (the second to be built in the World), and must receive the LEED Silver standard complying with the South Carolina... Last reply: Marcus Sheffer, Nov 15, 2011, 2:25 pm |
|
PC 34- Design for AdaptabilityPilot-Credits PC34: Design for Adaptabilityposted by albert kovacik on Nov 15, 2011, 2:01 pm
We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt... |
|
PC 29- Housing & Job ProximityPilot-Credits PC29: Housing and Jobs Proximityposted by albert kovacik on Nov 15, 2011, 1:36 pm
We were on the cusp of Gold level until our review came back with several points deducted from our energy model. Our Green Rater suggested that we look into the Pilot Credit program and felt... |
|
75% COMPLIANCE areaEBOM-2009 SSc7.2: Heat island effect - roofposted by Danna Sigal on Aug 30, 2010, 4:36 pm
Our roof is 100% covered with White EPDM material. On top of that material are the HVAC units. There are also a couple of vents and a hatch opening for roof access. All these things add up to... Last reply: Tristan Roberts, Nov 15, 2011, 1:20 pm |
|
Cumulative Facade Intrusion?Pilot-Credits PC14: Walkable Streetsposted by Kimberly Frith on Sep 16, 2011, 3:36 pm
Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade. One of the facades has 54 feet of blank length, while... Last reply: Chris Marshall, Nov 15, 2011, 12:38 pm |
|
Campuswide and Multi Building DocumentationNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Brian Moran on Jul 7, 2011, 2:46 pm
Does anyone have experience demonstrating compliance for campuswide or multiple buildings? We would like to document this credit for campuswide submission. The campus has a policy thta bans... Last reply: Deborah Lucking, Nov 15, 2011, 12:26 pm |
|
Alternative Compliance path for international projectsNC-2009 IEQc2: Increased Ventilationposted by Susann Geithner on Nov 15, 2011, 11:11 am
The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.... |