Log in
Forum
Topic

SSc2 Option 1 Development Desity

CI-2009 SSc2: Development Density and Community Connectivity
posted by Andrea Daniels on Dec 6, 2011, 8:18 am

Do all the buildings within the Density Radius have to be part of the calculation?

Last reply: Tristan Roberts, Dec 18, 2011, 12:49 am

Long Term Commitment

CI-2009 MRc1.1: Tenant space - long-term commitment
posted by Tiago e Silva on Sep 15, 2011, 6:44 am

I got I bit confused with the period of time which is considered to comply with the aim of this credit.

At first a thought the 10 year commitment counted from the date of the LEED...

Last reply: Tristan Roberts, Dec 18, 2011, 12:41 am

LEED EB as a LEED Building.. not yet certified.

CI-2009 SSc1: Site Selection
posted by Denise Santini on Dec 14, 2011, 11:09 am

Hi all,

We are in the process of selecting a building to put an interior fit up in. The building just registered for LEED EB gold. Now, even if the project loses a couple of points it...

Last reply: Tristan Roberts, Dec 18, 2011, 12:26 am

Base building EBOM credits denied

CI-2009 IDc1: Innovation in Design
posted by Raphael Sperry on Nov 28, 2011, 7:18 pm

I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the...

Last reply: Tristan Roberts, Dec 17, 2011, 11:50 pm

Define Movable Furnishings of IAQ Testing

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Holly Himes on Nov 30, 2011, 2:44 pm

The Reference Guide states movable furnishing such as workstations and partitions must be in place during...

Last reply: Tristan Roberts, Dec 17, 2011, 11:36 pm

Indoor Carpet Adhesives

CI-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Colleen Ice on Oct 6, 2011, 3:16 pm

Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives. Do I put them under both categories or just 4.3?
Right now I have duplicate...

Last reply: Tristan Roberts, Dec 17, 2011, 11:35 pm

Does it matter where to install occupancy sensors

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Steve Khouw on Jun 14, 2011, 10:55 pm

To earn this credit for Strategy 3, does it matter where we locate the sensors so long as we meet the minimum 75% connected light loads, right? The obvious choices would be in non-regularly...

Last reply: Tristan Roberts, Dec 17, 2011, 11:10 pm

Future Contract for SSc5

EBOM-2009 SSc5: Site development - protect or restore open habitat
posted by Frederick Freeman on Dec 17, 2011, 4:32 pm

We are currently pursuing...

Last reply: Tristan Roberts, Dec 17, 2011, 10:50 pm

Authentication of water fixture installation date

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by David Mortensen on Sep 8, 2011, 1:32 pm

Had anyone successfully used as-built drawings to verify the installation date of water fixtures? On this page, the Checklist states that,

"Formal authentication of the fixture upgrade...

Last reply: Emily Catacchio, Dec 17, 2011, 7:56 pm

Cost per Item/Number of Items Purchased Inquiry

Schools-2009 MRc4: Recycled Content
posted by Michael Kros on Dec 14, 2011, 3:49 pm

This question pertains to all of the following credits: MRc3, MRc4, MRc5, MRc6, MRc7, and IEQc4.

In order to document each of these credits, the forms on LEED Online asks you to indicate...

Last reply: Nadav Malin, Dec 17, 2011, 8:28 am