SSc2 Option 1 Development DesityCI-2009 SSc2: Development Density and Community Connectivityposted by Andrea Daniels on Dec 6, 2011, 8:18 am
Do all the buildings within the Density Radius have to be part of the calculation? Last reply: Tristan Roberts, Dec 18, 2011, 12:49 am |
|
Long Term CommitmentCI-2009 MRc1.1: Tenant space - long-term commitmentposted by Tiago e Silva on Sep 15, 2011, 6:44 am
I got I bit confused with the period of time which is considered to comply with the aim of this credit. At first a thought the 10 year commitment counted from the date of the LEED... Last reply: Tristan Roberts, Dec 18, 2011, 12:41 am |
|
LEED EB as a LEED Building.. not yet certified.CI-2009 SSc1: Site Selectionposted by Denise Santini on Dec 14, 2011, 11:09 am
Hi all, We are in the process of selecting a building to put an interior fit up in. The building just registered for LEED EB gold. Now, even if the project loses a couple of points it... Last reply: Tristan Roberts, Dec 18, 2011, 12:26 am |
|
Base building EBOM credits deniedCI-2009 IDc1: Innovation in Designposted by Raphael Sperry on Nov 28, 2011, 7:18 pm
I've had a pair of CIv2009 projects just denied (at first review) a couple of innovation points where the... Last reply: Tristan Roberts, Dec 17, 2011, 11:50 pm |
|
Define Movable Furnishings of IAQ TestingCI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Holly Himes on Nov 30, 2011, 2:44 pm
The Reference Guide states movable furnishing such as workstations and partitions must be in place during... Last reply: Tristan Roberts, Dec 17, 2011, 11:36 pm |
|
Indoor Carpet AdhesivesCI-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Colleen Ice on Oct 6, 2011, 3:16 pm
Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives. Do I put them under both categories or just 4.3? Last reply: Tristan Roberts, Dec 17, 2011, 11:35 pm |
|
Does it matter where to install occupancy sensorsCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Steve Khouw on Jun 14, 2011, 10:55 pm
To earn this credit for Strategy 3, does it matter where we locate the sensors so long as we meet the minimum 75% connected light loads, right? The obvious choices would be in non-regularly... Last reply: Tristan Roberts, Dec 17, 2011, 11:10 pm |
|
Future Contract for SSc5EBOM-2009 SSc5: Site development - protect or restore open habitatposted by Frederick Freeman on Dec 17, 2011, 4:32 pm
We are currently pursuing... Last reply: Tristan Roberts, Dec 17, 2011, 10:50 pm |
|
Authentication of water fixture installation dateEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by David Mortensen on Sep 8, 2011, 1:32 pm
Had anyone successfully used as-built drawings to verify the installation date of water fixtures? On this page, the Checklist states that, "Formal authentication of the fixture upgrade... Last reply: Emily Catacchio, Dec 17, 2011, 7:56 pm |
|
Cost per Item/Number of Items Purchased InquirySchools-2009 MRc4: Recycled Contentposted by Michael Kros on Dec 14, 2011, 3:49 pm
This question pertains to all of the following credits: MRc3, MRc4, MRc5, MRc6, MRc7, and IEQc4. In order to document each of these credits, the forms on LEED Online asks you to indicate... Last reply: Nadav Malin, Dec 17, 2011, 8:28 am |