Log in
Forum
Topic

Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Dec 18, 2020, 12:07 pm

I am working on a LEED v4.1 BD+C Medical Office Building project and trying to complet the WEc1 form.  There are no fixture options for for the following fixtures:

1)  Exam Room sinks or...

Last reply: emily reese moody, Feb 2, 2023, 12:13 pm

ADC- Alternative Daily Cover

NC-v4.1 MRc5: Construction and demolition waste management
posted by Catherine Blakemore on Feb 2, 2023, 9:25 am

Does ADC have to be included in the overall waste total for Option 2 or is it just factor into the overall total for Option 1 only?

  -If Option 2 is selection on the LEED Online form the...

Last reply: Dave Hubka, Feb 2, 2023, 9:28 am

Abandoned or Blighted Building: Calculate Interior Finish Elements?

NC-v4 MRc1: Building life-cycle impact reduction
posted by Summer Minchew on Feb 1, 2023, 3:00 pm

My project is the major renovation of a building that has been abandoned for almost 20 years. 99% of the existing...

LED Wall washer calculation

LEED v4.1 Discussion Forum
posted by Martina Vázquez on Feb 1, 2023, 6:35 am

Good morning,

I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know...

Cities with composting mandates should have streamlined documentation

Pilot-Credits SSpc129: Comprehensive Composting
posted by Adhamina Rodriguez on Sep 16, 2021, 3:09 am

Like the Alternative Compliance Path for California projects meeting CALGreen code, cities that have composting ordinances in place should have it easier to document this credit.

Last reply: Michelle Rosenberger, Jan 31, 2023, 6:17 pm

Do materials in building services count as 'permanently installed'?

NC-v4.1 MRc3: Sourcing of Raw Materials
posted by Cecilia Lopez-Cotarelo on Oct 18, 2022, 6:44 am

Do the materials used in the building services count a permanently installed materials when calculating the costs? I am working on a project where services make up a large proportion of the cost...

Last reply: Lawrence Rennell, Jan 31, 2023, 5:26 pm

Electrical service requirement for dual port Level 2 chargers

CS-v4.1 LTc8: Electric Vehicles
posted by Natalie Terrill on Apr 8, 2022, 12:27 pm

The current language requires a Level 2 charging capacity with 208-240 volts or greater for each space.

In the past we've installed conduit and wiring for dual chargers (1 charger using...

Last reply: Andrea Vickers, Jan 31, 2023, 10:56 am

Defining a baseline building

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Cecilia Lopez-Cotarelo on Jan 30, 2023, 12:41 pm

Hello,

I am carrying out an LCA for an EU-based project and am confused as to how to establish a baseline to compare improvements in the carbon footprint. 

The project is currently...

Last reply: Camilo Velez, Jan 31, 2023, 10:40 am

Connector Service to other bus routes

CS-v4 LTc5: Access to quality transit
posted by Nadia Azzam on Jan 30, 2023, 4:09 pm

I am working on a project with one of the stops serving a connector service. This is basically a bus route that connects to other routes. Can we count the other routes it connects to since...

Regarding Energy Simulation

NC-v4 EAc2: Optimize Energy Performance
posted by Nagaraj Sankar on Jan 30, 2023, 11:45 pm

In one of our LEED ID+C project, we are having scope of 8th floor and the total floor of the building is 12 floor. 
The suitable system as per ASHRAE 90.1 for this scenario is System 8. ...

Last reply: Marcus Sheffer, Jan 31, 2023, 9:21 am