Do non-contiguous habitat areas qualify?

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Jennifer Rennick on Apr 21, 2023, 12:48 pm

We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible. The available planting areas are distributed across the site (a perimeter path,...

Lights mounted under a photovoltaic canopy

CS-v4 SSc6: Light Pollution Reduction
posted by Samuel Calhoun on Apr 20, 2023, 4:43 pm

Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment? The engineer has selected indoor, vapor...

INpc142 Safety First Pilot Credit Arc Re-Entry

EBOM-v4.1 INc1: Innovation
posted by Barry Abramson on Apr 20, 2023, 12:46 pm

Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented...

INpc139 Safety First Pilot Credit- Building Water System Recommissioning

EBOM-v4.1 INc1: Innovation
posted by Barry Abramson on Apr 20, 2023, 12:34 pm

We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic. The Water Management...

Close-out of INpc156- Safety First: Maintenance of HVAC systems during COVID-19

Pilot-Credits INpc156: Safety First: Maintenance of HVAC systems during COVID-19
posted by Barry Abramson on Apr 20, 2023, 12:18 pm

We pursued this credit for several projects in 2021/2022. It was useful to ensure adequate HVAC maintenance was sustained through the pandemic, but at this point it should be standard practice....

No issues

Pilot-Credits EApc111: Alternative Performance Rating Method
posted by Maureen Mahle on Apr 20, 2023, 12:12 pm

I haven't found any major issue for this credit.

LEED Timeline / Schedule

LEED v4.1 Discussion Forum
posted by on Apr 20, 2023, 10:41 am

Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project? 

Thanks

Advanced Metering for district cooling

NC-v4 EAc3: Advanced Energy Metering
posted by Camilo Velez on Apr 12, 2023, 8:34 pm

Hi all,

We have encountered a peculiar situation in our project due to a couple of factors:

  •  our project is a building located in a campus and receives chilled water for...

Last reply: Camilo Velez, Apr 19, 2023, 12:05 pm

How to include existing fixtures in the calculator

NC-v4 WEp2: Indoor water use reduction
posted by Hashir Usman on Apr 18, 2023, 5:20 am

Dear all,

We have a project which is an extension of an existing industrial facility. The occupants of the new building can access it only by passing through the existing facility's...

Last reply: Hashir Usman, Apr 18, 2023, 7:05 am

Post your questions about Passive House here

Passive House Discussion Forum
posted by Paula Melton on Mar 4, 2019, 9:44 am

Integration Leader MITHUN LEEDuser Basic Member 1 thumbs up May 5, 2021- 1:50 pm Hi Amanda,  Just found this Discussion Forum page and your question from 2 years ago. If you, or others, are still looking...

Last reply: Brian Cornwell, Apr 17, 2023, 3:58 pm