Topic | Recent |
---|---|
Regional Priority pointsSchools-NC-v4 RPc1: Regional Priorityposted by ILDA SHALLO on Jun 7, 2023, 3:55 pm
How are these Regional Priority points awarded? Are these points automatically awarded once we get those credits, that also qualify as Regional Priority, awarded? Is there anything extra we need... |
|
V4.1 Option2 (EV-ready infrastructure) parameters of providing raceways?CS-v4 LTc8: Green vehiclesposted by Ronnel Flores on Nov 20, 2019, 8:29 pm
Our project vies for this credit and chose to pursue Option 2 Electric Vehicle Charging Infrastructure. We need to make 8 parking spaces EV ready. These 8 spaces are scattered 2 spaces per... Last reply: Samuel Calhoun, Jun 7, 2023, 10:44 am |
|
Denied Innovation Credit- where to go from here?NC-v4.1 INc1: Innovationposted by Chyanne Husar on Jun 6, 2023, 12:50 pm
We have attempted to achieve the Pilot Credit - Bird Collision Deterrence. For Design Final Review, our documentation was deemed to "not demonstrate compliance" and one point is "Denied". ... |
|
What are the mandatory major renovation activities that must be done to qualify for LEED NC for an existing building?LEED Rating System Selectionposted by Dina El-Sady on Feb 25, 2020, 7:22 am
A building undergoing major renovation including HVAC and electric systems ,window replacements and interior changes but the exterior wall will only be painted ?Does it qualify for LEED NC? Last reply: Dave Hubka, Jun 5, 2023, 3:46 pm |
|
Healthcare renovationLEED v4.1 Discussion Forumposted by Denise Thompson on May 6, 2021, 7:49 pm
Hi, we're renovating 2 of the floors of an ... Last reply: Nadia Azzam, Jun 5, 2023, 1:40 pm |
|
What requirements apply to the big (over 8cu ft capacity) washing machines used for onsite laundry of bedding and towels?Hospitality-NC-v4 WEc2: Indoor water use reductionposted by Glen Boldt on Jun 3, 2023, 3:33 am
Per the EPA /Energy Star definition, the commercial washing machines are coin or card operated types for use by multiple residents of a building - this is similar to the situation for hotel... |
|
Parking Generation 4th editionHelp Wanted: LEED-related Jobsposted by Rasha Ameer on Jun 2, 2023, 2:17 pm
Hello everyone, Can someone please check if the 4th edition parking generation has General Office Building? I found it in the list but not in the figures. Can anyone help solve my problem... |
|
Advanced Metering NC Space ExemptionsNC-v4 EAc3: Advanced Energy Meteringposted by Alexandra Markus on Jun 1, 2023, 1:45 pm
I'm working on a recreation center project that includes a daycare. The daycare space will not be fit-out as part of the project. From my understanding, we can exclude a small portion of the... Last reply: Marcus Sheffer, Jun 2, 2023, 1:32 pm |
|
Manufacturing building extensionLEED Rating System Selectionposted by Robert Yates on Jun 2, 2023, 10:36 am
I'm trying to figure out the best LEED version to use for an extension of an existing manufacturing building. It has not yet been determined if it will be open to the existing building (no walls... Last reply: Dave Hubka, Jun 2, 2023, 11:15 am |
|
IAQ Testing Protocol for LEED and Living Building ChallengeNC-v4.1 EQc4: Indoor air quality assessmentposted by Dane Andersen on Jun 2, 2023, 11:11 am
Hello, Does anyone know if the air testing protocol for the Living Building Challenge Healthy Interior Performance is acceptable to meet LEED Air Testing requirements? I am hoping to avoid... |