Topic | Recent |
---|---|
LEED V4.1 O&M Precertification denied.LEED v4.1 Discussion Forumposted by shashank gangil on Feb 26, 2024, 10:32 pm
Dear, I recently enrolled a project on LEED online for LEED V4.1 O&M. We are going for Pre-Certification First. For Pre-certification of LEED v4.1 O&M, we need to fill a... |
|
One-time air testing: how to enter readings in the ARC platformEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by jimmy Adames on Feb 26, 2024, 1:35 pm
Greetings, I have a few questions regarding this credit.
|
|
Reused dishwashersNC-v4.1 WEp2: Indoor water use reductionposted by Rachael McGinley on Feb 21, 2024, 4:37 pm
HI, the new version of the credit states that dishwashers that are reused do not need to comply with the credit requirements. Does this apply to dishwashers that are reused in the same... Last reply: emily reese moody, Feb 26, 2024, 1:24 pm |
|
Serious(ly) Newb Question: ASHRAE 90.1,LEED v4.1 Discussion Forumposted by on Feb 25, 2024, 1:41 am
Hi Folks, I am the poor slob (AKA apprentice) tasked with sorting out the credit our local electrical utility will allow for a lighting project of a commercial bldg outside parking lot.... |
|
Confirmation of Agent's AuthorityLEED v4.1 Discussion Forumposted by Aaron Kennedy on Nov 24, 2020, 11:00 am
We are filling out the Confirmation of Agent's Authority. Does the agent need to be the LEED Accredited Professional or can it be me, the lowly non LEED certified person? Thank you,... Last reply: Filippo Weber, Feb 26, 2024, 5:56 am |
|
How outdoor water is calculated for green walls (vertical vegetations)?NC-v4 WEp1: Outdoor water use reductionposted by Leo LeQuoc on Feb 25, 2024, 6:24 pm
Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade. As LEED calculator only defines vegetation on... |
|
How outdoor water is calculated for green walls (vertical vegetations)?NC-v4 WEp2: Indoor water use reductionposted by Leo LeQuoc on Feb 20, 2024, 5:50 am
Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade. As LEED calculator only defines vegetation on... Last reply: Leo LeQuoc, Feb 25, 2024, 6:20 pm |
|
Minimum OA OptionsEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Courtney Mayes on Feb 23, 2024, 3:59 pm
Hello, I have a site that has a shared OAD for two units. The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage. Even with reduced CFM per occupant... Last reply: Dave Hubka, Feb 24, 2024, 8:14 pm |
|
Integrative Process FacilitatorNC-v4.1 IPc1: Integrative processposted by Edward Reifenstein on Mar 10, 2023, 12:41 pm
The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results,... Last reply: Melissa O'Mara, Feb 24, 2024, 9:22 am |
|
Previously developed landWarehouses-NC-v4 LTc4: Surrounding density and diverse usesposted by Rebekah Brown on Feb 22, 2024, 3:01 pm
Hi, My current project is going to be built on a previously developed parking lot. It was mainly used to hold construction vehicles. For option 1 of this credit it requires the previously... Last reply: Deborah Lucking, Feb 23, 2024, 11:37 am |