IAQ testing credit substitution backwards from 4.1 to 4.0?NC-v4.1 EQc4: Indoor air quality assessmentposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Sep 30, 2024, 5:15 pm
Hi all, I have heard that some teams have done a credit substitution from a v4.1 (New Construction) project backwards to the v4.0 criteria. I am somewhat skeptical of being able to do this... Last reply: Jeff Ross-Bain, PE, LEED Fellow, WELL AP, Oct 9, 2024, 10:32 am |
|
Switching Options Post-Preliminary Design ReviewNC-v4 LTc4: Surrounding density and diverse usesposted by Darrah Jakab on Oct 8, 2024, 6:27 pm
We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1. Has anyone switched options post-... Last reply: Dave Hubka, Oct 9, 2024, 8:58 am |
|
Only FSC should count as a preferred paper product under Green CleaningLEED v5 O&M Existing Buildings 2nd Public Commentposted by Nadav Malin on Oct 9, 2024, 6:52 am
In the Green Cleaning credit under Janitorial Paper options, both... |
|
Last chance to comment on LEED v5LEED v5 O&M Existing Buildings 2nd Public Commentposted by Nadav Malin on Sep 27, 2024, 9:50 am
Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread. The... |
|
Option 2. Natural land cover conditions (3 points except Healthcare, 2 points Healthcare)CS-v4.1 SSc4: Rainwater managementposted by Ammar Yahia on Aug 1, 2024, 6:24 am
As we have 203,000 sqm site area within LEED boundary, with a majority of impervious roof, non-roof driveways, walkways, and landscape areas, basements extend on 100% of site area. We want to... Last reply: Finance Team, Oct 9, 2024, 5:37 am |
|
Baseline and Proposed Constructions for a building constructed in 1970 for ID+C ProjectNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Oct 8, 2024, 12:03 pm
Hi, I am working on a LEED ID+C V4project , we dont have existing construction details for the building and the building was constructed in 1970, What should i assume for building... Last reply: Marcus Sheffer, Oct 8, 2024, 12:24 pm |
|
Would a fieldhouse structure be included within the LEED BoundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by on Oct 8, 2024, 10:04 am
Our project is a community centre that includes a field house... |
|
Multiple Cx Agents for the Option PathsNC-v4 EAc1: Enhanced Commissioningposted by Saagar Patel on Feb 25, 2020, 9:52 am
I do... Last reply: Joyce Kelly, Oct 8, 2024, 8:57 am |
|
TallyCAT for LEED submission?NC-v4.1 MRc1: Building life-cycle impact reductionposted by Apoorva Pradhan on Sep 5, 2024, 8:29 pm
Has anyone here used TallyCAT for a LEED submission? I’ve just started my first TallyCAT model, and it seems to only represent... Last reply: Denise Gravelle, Oct 7, 2024, 5:01 pm |
|
Proposed Building's HVAC systemCS-2009 EAp2: Minimum Energy Performanceposted by Luis Andrade on Jun 22, 2018, 9:42 am
Hi everyone, I'm modeling an office building under LEED CS v2009. The scope of C&S includes a centralized cooling and heating system (air cooled chilers and heat pumps), ventilation... Last reply: Tyler Thumma, Oct 7, 2024, 7:44 am |