Log in
Forum
Topic

Change of space during performance period

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Pulak Goyal on Dec 8, 2023, 3:12 am

I have a building going for LEED O+M v4.1 Existing Buildings Certification. 

Currently it has offices on one of the floors, but it is going to be changed into inactive storage space in the...

(mis)Understanding the LEED Review (and appeal) process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susannah Goddard on Apr 28, 2015, 10:04 am

We have recently undergone the Final Design Stage Review and have some credits 'denied'. I was of the understanding that we could submit additional documentation to denied design stage credits...

Last reply: Callie Reymann, Dec 7, 2023, 3:28 pm

Meeting the credit intent

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Jon Hall on Apr 29, 2016, 11:41 am

The credit intent states the following:

Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and...

Last reply: Richard Manning, Dec 6, 2023, 5:52 pm

Retail FTE Access

CS-v4 LTc6: Bicycle facilities
posted by Michelle Rosenberger on Dec 5, 2023, 11:34 am

This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities...

Last reply: Dave Hubka, Dec 6, 2023, 3:57 pm

Existing Parking Lot

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Laura Soma on Dec 5, 2023, 12:55 pm

If building next to an existing parking lot, which will serve the new...

Last reply: Dave Hubka, Dec 6, 2023, 3:43 pm

Project phases vs LEED certification approach?

LEED Guidance for Campuses and Multiple Buildings
posted by Ehsan Baharvand on Jul 10, 2016, 3:27 am

Dear all,

I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time):
...

Last reply: Dave Hubka, Dec 6, 2023, 3:31 pm

Energy Metering Displays

NC-v4 EAc3: Advanced Energy Metering
posted by Allison Para on Dec 5, 2023, 12:33 pm

Hello Pros,

I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.

The accountable submetering consumption is for each floor, not...

Last reply: Allison Para, Dec 5, 2023, 3:07 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2: Low-emitting materials
posted by Edgar Arevalo on Sep 29, 2023, 11:46 am

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor, but no...

Last reply: Dave Hubka, Dec 4, 2023, 5:05 pm

Electric vehicle charging station used in demand response strategy

NC-v4 EAc4: Demand response
posted by Martina Salonen on Aug 24, 2018, 9:14 am

quite common for the demand response programs here, but since I found no mention of this anywhere in the LEED manual nor forum, I wanted to confirm that it is acceptable strategy and whether anybody has...

Last reply: Marcus Sheffer, Dec 4, 2023, 3:41 pm

Innovation: PBT source reduction- lead, cadmium and copper

NC-v4 INc1: Innovation
posted by David Dixon on Oct 27, 2017, 11:57 am

the credit does not allow for lead in roofing or flashing.

almost all steel is recycled and the companies report minor lead in the material due to the recycled materials - the one we are...

Last reply: Ann Busker, Dec 4, 2023, 10:23 am