Topic | Recent |
---|---|
Light pollution creditNC-v4 SSc6: Light Pollution Reductionposted by Christina Skandali on Jun 1, 2023, 9:41 am
Hello! The questions refer to a new office buiding according to LEED v4 version. The building which is situated in a LZ2 area and the lighting boundaries are very close to the... Last reply: Bill Swanson, Jul 24, 2023, 8:38 am |
|
Band for UMLHs for vault spaces in a Data CenterNC-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Jul 5, 2023, 3:06 pm
Hi , I am modeling a LEED model for data center, now for vault spaces I am assuming a setpoint of 99 F for cooling and 20 F for heating, what should be band to consider a vault space UMLH? for... Last reply: Rajat Wadhwa, Jul 21, 2023, 1:27 pm |
|
Irrigation Establishment Period Flexibility / Regional AdjustmentsNC-v4 WEp1: Outdoor water use reductionposted by Pooja Sannamani on Mar 8, 2022, 5:16 pm
For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-... Last reply: emily reese moody, Jul 20, 2023, 11:09 pm |
|
Option 2, ANC-v4 EQc6: Interior lightingposted by Simon Lai on May 9, 2016, 11:47 am
In the open office, I'm providing direct/indirect fluorescent up-light, does it meet the exception of the Option 2A? Last reply: Glenn Heinmiller, Jul 20, 2023, 5:18 pm |
|
Shower column kit with 3 different features and water consumptions.NC-v4 WEp2: Indoor water use reductionposted by Olga Yuil on Mar 30, 2020, 10:42 pm
For showers in a new Project a shower column kit will be installed and it includes: a showerhead, a hose and a faucet. (Example: Kohler Singulier K-72672T-C4-CP) Each of... Last reply: emily reese moody, Jul 20, 2023, 4:23 pm |
|
Reclaimed water irrigation service metering- can this effectively fulfill quota of (2) minimum water subsystems?NC-v4 WEc4: Water meteringposted by Joanna Switzer on Feb 14, 2018, 9:08 am
Step 2 of the Step-by-Step BD+C Reference guidance notes...."if the team is using... Last reply: Kristen Magnuson, Jul 20, 2023, 2:27 pm |
|
LEED v4 Waste Monitoring unit of measurement in Truck LoadCS-v4 MRc5: Construction and demolition waste managementposted by Ronnel Flores on Mar 11, 2020, 8:41 pm
Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume? Shall we determine just an average volume for one truck load in any of the units in the calculator... Last reply: Chris Leoni, Jul 20, 2023, 11:19 am |
|
Waste ManangementWarehouses-NC-v4.1 MRc5: Construction and demolition waste managementposted by Joseph Snider on Jul 20, 2023, 10:54 am
Working on warehouses in areas that do not have many options for recycling. Just to be clear, can you do just the waste reduction option of <10 lbs/SF and if so, that is all you put in the... |
|
Gather one year waste data or do a waste analysis/audit?EBOM-v4.1 MRp3: Waste Performanceposted by shashank gangil on Sep 16, 2022, 8:56 pm
Dear, The language of LEED V4.1 says that project either collect one year waste data or waste analysis. Does it means, the waste analysis is an audit which can be done based on less then 1... Last reply: Randi B., Jul 19, 2023, 8:36 pm |
|
Changing structural systems between the baseline and proposed designNC-v4 MRc1: Building life-cycle impact reductionposted by Ahmed Abd El Fattah on Apr 5, 2023, 12:05 am
Hello Is changing from concrete... Last reply: Afogreen Build, Jul 19, 2023, 12:34 am |