Log in
Forum
Topic

Can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized for credit compliance?

Healthcare-v4.1 EAc3: Advanced Energy Metering
posted by Keith Robertson on Feb 1, 2024, 1:34 pm

For low-level metering of loads, greater than 10% can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized to collect data in accordance with obtaining the advance...

Last reply: Marcus Sheffer, Feb 6, 2024, 5:05 pm

FEES FOR BASEMENT AREA

LEED v4.1 Discussion Forum
posted by Subrota Roy on Feb 6, 2024, 4:21 am

 Is it necessary to calculate the basement area when we calculate the...

Purchasing- Lamps with UV-C

NC-v4 INc1: Innovation
posted by on Aug 1, 2023, 1:50 pm

Does anyone know if the Purchasing - Lamps innovation credit requires reporting of UV-C lights in air handlers (for coil irradiation and virus mitigation)? If so, what is the equivalent pg HG...

Last reply: Edgar Arevalo, Feb 5, 2024, 3:11 pm

Concern regarding entryway systems

EBOM-v4.1 EQc1: Green Cleaning
posted by Wafa Arif on Jan 25, 2024, 4:01 am

Hello,

Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel.

In our hotel project, the double door entrances leave no space...

Last reply: Stephen Ashkin, Feb 5, 2024, 1:33 pm

beyond the 25 feet boundary and neighboring business

CI-v4 EQp2: Environmental tobacco smoke control
posted by Edgar Arevalo on Dec 6, 2023, 4:10 pm

There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance.  The thing is it is next to neighboring business that are are within the 100 feet and...

Last reply: Edgar Arevalo, Feb 5, 2024, 11:44 am

Credits Applicable for Product-Services?

EBOM-v4.1 MRc1: Purchasing
posted by Marieke Head on Feb 5, 2024, 8:45 am

My client owns a product-service company that makes (charged) rechargeable batteries available to their clients on a subscription model, whereby my client maintains ownership of the batteries....

Leak detection based on water meter

Pilot-Credits WEpc153: Water Leak Detection and Monitoring
posted by Michaël Briffaz on Feb 5, 2024, 8:47 am

Hey,

The credit languages is stating to "Install water sensors connected to a local network internet BMS or metering solution on water using subsystems."

Would it be ok to...

Parksmart measures

NC-v4 INc1: Innovation
posted by Norbert Szircsak on Jul 17, 2019, 4:57 am

Dear All,

The innovation strategy 1 under Innovation: Parksmart Measures looks a good fit for our project, and I think generally for many projects.

However from the wording of the...

Last reply: Michaël Briffaz, Feb 5, 2024, 8:37 am

Is string lighting exempt from the Light Trespass/Uplight requirements.

NC-v4 SSc6: Light Pollution Reduction
posted by Summer Gorder on Feb 2, 2024, 7:04 pm

Hi, we have a project where they are using string lighting to light a pathway. Is string lighting exempt from the Light Trespass/Uplight requirements due to the low wattage based on ASHRAE or...

Last reply: Glenn Heinmiller, Feb 3, 2024, 4:37 pm

How can an expansion project with zero indoor water use scope comply with WEp2 requirement to reduce potable water use > 20%?

Warehouses-NC-v4 WEp2: Indoor water use reduction
posted by Blake Jackson on Dec 1, 2023, 2:44 pm

I'm working on a 455,000gsf expansion of an existing warehouse/stroage facility. The existing facility won't be renovated, spare for the demolition of an existing exterior wall to provide...

Last reply: emily reese moody, Feb 3, 2024, 1:22 pm