Topic | Recent |
---|---|
Materials and Resources | Optimized Building ProductsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Michael Scharpf on May 16, 2024, 1:49 pm
|
|
Overall LEED v5 commentLEED v5 O&M Existing Buildings Public Commentsposted by Drew Yetter on May 16, 2024, 1:21 pm
Where possible, please integrate all calculators and forms into LEED Online. |
|
LEED v5 BD+C/ID+C Water Efficiency public commentsLEED v5 BD+C/ID+C: Water Efficiency Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:24 amto separate things like drinking fountains and mop sinks. https://leeduser.buildinggreen.com/forum/electric-water-coolers-drinking... https://leeduser.buildinggreen.com/forum/separation-service-sinks-and-in... https://leeduser.buildinggreen.com/forum/ice-machines https://leeduser.buildinggreen.com/forum/submetering-process-water-assis... https://leeduser.buildinggreen.com/forum/water-metering-v40-janitors-clo... https://leeduser.buildinggreen.com/forum/indoor-plumbing-fixtures-and-fi... Log in or register to post comments Paul Sambanis LEEDuser Basic Member May 16, 2024- 4:53 am My name is Paul Sambanis, and I am the Vice President of Sustainability at Sloan, a manufacturer... Last reply: rose gicheru, May 16, 2024, 1:07 pm |
|
ENERGY STAR equipmentCI-v4 EAc2: Optimize Energy Performanceposted by Michael d on Dec 8, 2020, 5:40 am
Do laptops need to be included within this list? Also, does any old equipment such as old laptops or others have to be included in the list as well, or are we only looking at the new equipment... Last reply: Ruth Kurz, May 16, 2024, 12:23 pm |
|
Combining number of tripsNC-v4.1 LTc5: Access to quality transitposted by Ahmed Abdul Rahman on May 16, 2024, 8:52 am
Hello All, I am doing calculations fro the Access to Quality Transit. I have a bus stop within 1/4 mile from the project location and a... Last reply: Ahmed Abdul Rahman, May 16, 2024, 11:21 am |
|
I like the whole carbon assessment but...quantify impacts beyond carbon?LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by simon fowell on May 16, 2024, 10:43 am
I think it would be impactful to show the social value of the carbon reduced/emitted from the project, rather than just the tonnes. Also, thinking about broader impacts around air pollution and... |
|
Surprised Triple Bottom Line Analysis isn't hereLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by simon fowell on May 16, 2024, 10:36 am
I think the Triple Bottom Line assessment (i.e. quantifying the value/impact of the design) would be beneficial in this category for 3 reasosn:
|
|
LEED v5 for existing building cleaning standardsLEED v5 O&M Existing Buildings Public Commentsposted by Jim Wallace on May 15, 2024, 3:05 pm
My name is Jim Wallace, and I am a COO for the professional cleaning industry based in Detroit. I am concerned that the proposed LEED v5 undervalues cleaning, particularly green cleaning... |
|
CommentLEED v5 O&M Existing Buildings Public Commentsposted by Bill Elwell on May 15, 2024, 3:06 pm
My name Bill Elwell, Warehouse and Fleet Manager and my comments represent New Image Building Services, a facility service provider regarding the Proposed LEED O+M: Existing Buildings v5 draft.... |
|
Green CleaningLEED v5 O&M Existing Buildings Public Commentsposted by Crystal Sansom on May 15, 2024, 3:07 pm
My name Crystal Sansom and my comments represent New Image Building Services, a facility service provider regarding the Proposed LEED O+M: Existing Buildings v5 draft. Specifically, our comments... |