Log in
Forum
Topic

Purple Roof

NC-v4 SSc5: Heat Island Reduction
posted by Edgar Arevalo on Jun 20, 2024, 12:29 pm

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwater...

Last reply: emily reese moody, Jun 23, 2024, 7:50 pm

Entryway system

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by RAMON CHRISTOPHER MEDRANO on Nov 17, 2021, 10:11 pm

I have a office space project, that will have an entryway system (walk off matt). My question is where is the accaptable way to install the walk of matt it should be 10-feet (3meters) inside the...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 6:02 am

LEED ND Plan on Indoor Water Use Reduction

ND-Plan-v4 GIBp3: Indoor water use reduction
posted by Michael Wahjudi on Oct 30, 2020, 4:27 am

Hi all,

Under GIB Prerequisite: Indoor Water Use Reduction, as the concept plan might be limited on details on fixtures and fittings. Are we able to use letter of undertaking on maximum...

Last reply: Eliot Allen, Jun 22, 2024, 5:03 pm

Calculating FTEs and regularly occupied spaces: Auditorium

Calculating FTEs
posted by Carlos Bueno on Jun 18, 2024, 3:23 pm

Hello everyone,

I have a question: I need to calculate the FTEs and define the areas of regular occupancy for a convention center that includes office spaces and two event halls that could...

Last reply: Andrey Kuznetsov, Jun 22, 2024, 6:39 am

Minimum Program Requirements- Must use a reasonable site boundary: site + building

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Theresa Lehman on Jun 21, 2024, 10:59 am

This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals. This is one...

Last reply: Deborah Lucking, Jun 21, 2024, 11:29 am

Are jet bridges inside or outside the building envelope?

NC-v4.1 EQc2: Low-emitting materials
posted by Theresa Lehman on Jun 17, 2024, 6:27 pm

I am working on an airport project. Are jet bridges (Division 11), considered to be inside or outside the building envelope?

Last reply: Deborah Lucking, Jun 21, 2024, 11:09 am

Pilot Credit INpc155

Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Control
posted by Roxanne Button on Jul 12, 2021, 4:13 pm

Has anyone attempted this Pilot Credit yet?  Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requirements...

Last reply: Michelle Halle Stern, Jun 21, 2024, 10:53 am

Can the Shower Rooms be included in the Tenant's Sale Lease Agreement?

CS-v4 LTc6: Bicycle facilities
posted by Nadia Garcia on Apr 18, 2024, 3:59 pm

Hello LEED community,

I'm seeking clarification regarding the Bicycle Facilities credit requirements in LEED v4 BD+C: Core & Shell, specifically regarding the inclusion of shower...

Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:42 am

If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awar

NC-v4 WEc1: Outdoor water use reduction
posted by Nandan Tavkar on Jun 19, 2024, 5:39 am

If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm 

Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:40 am

LEED PC 66 Community Contaminant Prevention

Pilot-Credits EApc66: Community contaminant prevention - airborne releases
posted by Amanda Brathwaite on Apr 16, 2015, 4:55 pm

There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that...

Last reply: Michelle Halle Stern, Jun 21, 2024, 10:34 am