Topic | Recent |
---|---|
Loading Bays & Motorcycle racksNC-2009 SSc7.1: Heat island effect - nonroofposted by Maya Karkour on Jan 18, 2011, 10:24 am
Dear all, I am seeking 2 points for this credit for a retail mall by placing all the parking spaces under cover. My questions are: 1) There are 2 loading bays on different... Last reply: Tristan Roberts, Jan 20, 2011, 8:02 pm |
|
Mechanical ventilation systems with operable windowsEBOM-2009 IEQc1.3: Indoor air quality best management practices - increased ventilationposted by Dan Whittet on Jun 24, 2010, 9:10 pm
What if my mechanical ventilation was sufficient to meet ASHRAE 62.1 minimums AND the majority of my rooms had operable windows? Could I use the operable windows to meet the 30% additional... Last reply: Tristan Roberts, Jan 20, 2011, 7:15 pm |
|
Skylight with FinsCS-2009 SSc7.2: Heat island effect - roofposted by Maya Karkour on Jan 19, 2011, 9:25 am
Dear all, My project is a retail mall with a very big skylight across the mall's width. The skylight has alternating horizontal fins made of 19mm thick mild steel, meaning that one... Last reply: Tristan Roberts, Jan 20, 2011, 7:06 pm |
|
LEED CI in a LEED NC building-overlapping creditsCI-2009 WEc1: Water Use Reductionposted by Leslie Jones on Jan 12, 2011, 10:38 amand forums. Log in or register to post comments ... Last reply: Tristan Roberts, Jan 20, 2011, 6:58 pm |
|
Science lab water use calcsSchools-2009 WEc3: Water Use Reductionposted by Keelan Kaiser on Jan 15, 2011, 3:36 pm
We are working on an addition which is half science labs, what role do the sinks in the labs play in the water consumption/reduction equation? How are they factored in since they are an... Last reply: Tristan Roberts, Jan 20, 2011, 5:41 pm |
|
Drawing scaleSchools-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Terry Squyres on Jan 20, 2011, 5:14 pm
Does LEED require any minimum scale for drawings, either for credits or for the general project drawings? Last reply: Tristan Roberts, Jan 20, 2011, 5:36 pm |
|
Exemplary performance limits for on-site renewablesSchools-2009 IDc1: Innovation in Designposted by Keelan Kaiser on Jan 18, 2011, 1:34 pm
In 2007 Schools, can we apply for two ID points if we get our on-site renewable production up to 22.5% (12.5% + 5% + 5%)? 25.5%? This seems like a possibility if I read correctly the limit of up... Last reply: Tristan Roberts, Jan 20, 2011, 5:32 pm |
|
Option 1- Can All Three(3) Spaces be ClassroomsSchools-2009 SSc10: Joint Use of Facilitiesposted by James Keohane on Jan 16, 2011, 2:21 pm
The credit language for Option 1 states in part that...... "at least three(3) of the following spaces included in the school are accessible to and avilable for shared use by the general public:... Last reply: Tristan Roberts, Jan 20, 2011, 5:12 pm |
|
Number of StudentsGeneral forumsposted by Maura Adams on Jan 12, 2011, 1:06 pm
I'm working on a boarding school classroom building. We have 535 students, but they'll spend a maximum of 2 hours/day in the building. The form seems to assume a traditional school building,... Last reply: Tristan Roberts, Jan 20, 2011, 4:58 pm |
|
LEED NC or LEED Homes?LEED Rating System Selectionposted by Rob Hink on Jan 13, 2011, 12:42 pm
We are designing a building to serve as the Deans Residence for a large University. While serving as the deans home it also will be designed for receptions and meetings. Its is a 2 story... Last reply: Tristan Roberts, Jan 20, 2011, 4:40 pm |