In 2007 Schools, can we apply for two ID points if we get our on-site renewable production up to 22.5% (12.5% + 5% + 5%)? 25.5%? This seems like a possibility if I read correctly the limit of up to 3 credits, but I wanted to make sure I am reading the requirements correctly. Thanks so much.