Partial BrownfieldNC-2009 SSc3: Brownfield Redevelopmentposted by Shannon Terrell on Mar 25, 2011, 1:08 pm
LEED does not establish a minimum % of the site that has to be considered a... Last reply: Larry Sims, Mar 25, 2011, 3:24 pm |
|
Emission Reporting using Energy StarEBOM-2009 EAc6: Emissions Reduction Reportingposted by Simon Sue on Mar 22, 2011, 5:31 am
When i click on the "select view" then to Performance :... Last reply: Jenny Carney, Mar 25, 2011, 2:20 pm |
|
Maximum Points AvailableEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by David Hubka on Mar 24, 2011, 5:14 pm
The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under... Last reply: Jenny Carney, Mar 25, 2011, 2:14 pm |
|
time delay in fit outGeneral forumsposted by Tristan Roberts on Mar 22, 2011, 11:37 am
Sonia, I don't see an issue with this. As long as you define the project scope as encompassing all the work you describe, and you are able to collect all the needed documentation and meet... Last reply: Tristan Roberts, Mar 25, 2011, 12:49 pm |
|
Finish Grading, Seeding and Plantings- applicable for MRc5?NC-2009 MRc5: Regional Materialsposted by Renee Shirey on Mar 15, 2011, 11:44 am
In the Resource book on page 383 and 385 I see tables that have "plant material" as one of the regional items, but I am confused by the language in the actual credit - "BUILDING materials or... Last reply: Tristan Roberts, Mar 25, 2011, 12:43 pm |
|
Biomass BoilerNC-2009 EAc2: On-Site Renewable Energyposted by sara frye on Mar 21, 2011, 11:54 am
Our project, a small non-profit farm house renovation, is using a... Last reply: Tristan Roberts, Mar 25, 2011, 12:09 pm |
|
EQ6.2 Return air flowLEED for Homes (LEED-H) Forumposted by mike diess on Feb 1, 2011, 11:25 am
EQ6.2 a) states:"Size the opening to 1 sq inch per cfm of supply air (this area may include free area undercut below door)." When using a grille are they specifying gross or net area? Our firm... Last reply: Rob Moody, Mar 24, 2011, 8:02 pm |
|
Roof with solar panelsEBOM-2009 SSc7.2: Heat island effect - roofposted by Matthew Perna on Dec 30, 2010, 9:08 am
Does anyone know why a roof covered with solar panels wouldn't apply to credit 7.2: Heat Island Reduction--Roof? The USGBC allows it to be used toward credit 7.1 where a roof with solar panels... Last reply: David Posada, Mar 24, 2011, 12:41 pm |
|
GuaduaNC-2009 MRc6: Rapidly Renewable Materialsposted by Carlos Alberto Hoyos Soto on Mar 24, 2011, 10:23 am
I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks. Last reply: Tristan Roberts, Mar 24, 2011, 11:30 am |
|
Innovative water efficiencyEBOM-2009 IOc1: Innovation in Operationsposted by Melissa Merryweather on Mar 24, 2011, 12:00 am
A project considering LEED... Last reply: David Hubka, Mar 24, 2011, 7:58 am |