Log in
Forum
Topic

Lighting Control- Recording Studio

CI-v4 EQc6: Interior lighting
posted by Edgar Arevalo on Aug 15, 2023, 2:41 pm

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After checking this...

Option 2. Prescriptive Compliance

CI-v4 EAp2: Minimum Energy Performance
posted by Dave Hubka on Oct 15, 2021, 10:45 am

kinda embarrassed to ask this one, but here goes...

The ref guide and credit template require the team to upload the Target Finder performance results when pursuing Option 2. Prescriptive...

Last reply: Michelle Rosenberger, Aug 15, 2023, 11:51 am

LEED Certification for an Existing Building

LEED v4.1 Discussion Forum
posted by Mary Christel Eugenio on Aug 15, 2023, 7:57 am

Hi,
Is there a closing date for v4 now that we have v4.1?
We'll be registering for the LEED Certification of one of our properties for the first time.
Should we go for v4 or v4....

Furniture

NC-v4 MRc5: Construction and demolition waste management
posted by Alexandra Kravel on Aug 14, 2023, 12:28 pm

We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing...

Furniture

NC-v4 MRp2: Construction and demolition waste management planning
posted by Alexandra Kravel on Aug 14, 2023, 12:26 pm

We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing...

Passive Survivability and Back-up Power During Disruptions

NC-v4 INc1: Innovation
posted by Ridhwan Omar on Mar 29, 2019, 10:42 am

Hello LEEDUsers!

We have a resort hotel project in one of the islands in Micronesia.

Due to reliability problems with the electricity system on the island and the lack of reserve...

Last reply: Graham Linn, Aug 14, 2023, 1:28 pm

Patient Rooms

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Vanessa Hostick on Aug 14, 2023, 12:23 pm

Does anyone have experience documenting this pilot credit on a hospital?  It's unclear if the patient room should be included or excluded from the documentation and count. Each of our patient...

locker roms

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Belén Palao on Apr 27, 2022, 12:45 pm

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 183 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 13 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED...

Last reply: Vanessa Hostick, Aug 14, 2023, 12:05 pm

Future medical office building- views methodology

CS-v4.1 EQc5: Quality Views
posted by Jeremy Shiman on Aug 14, 2023, 10:45 am

We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB. We have tentative floor plan layouts for...

PCR for Pavement Preservation

NC-v4.1 MRc2: Environmental Product Declarations
posted by Mike March on Aug 11, 2023, 12:02 am

I’m working on generating an LCA and EPD for a product I develop and am running into an unexpected hurdle - finding a PCR and Program Operator. I don't want to promote products on this forum but...