WaterSense no longer applicable to sensor-equipped lavatory faucets?NC-v4 WEp2: Indoor water use reductionposted by Brian Salazar on May 17, 2023, 6:06 pm
Hi all - So, this one has snuck up on me. Working on several commercial/office projects now; helping to specify restroom fixtures. It seems that the EPA WaterSense certification has changed to... Last reply: Brian Salazar, Sep 22, 2023, 4:16 pm |
|
Baseline for Projects with Several Physically Distinct StructuresHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by Mike Mentzos on Sep 15, 2023, 4:36 pm
We are currently working on a project which has a total area of about 4,000m2. The project consist of several buildings, each of them is no more than 2,300 m... Last reply: Marcus Sheffer, Sep 22, 2023, 11:29 am |
|
Baseline Projects with Several Physically Distinct StructuresHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by MICHAIL MENTZOS on Sep 18, 2023, 3:37 am
We are currently working on a project which has a total area of about 4,000m2. The project consist of several buildings, each of them is no more than... Last reply: Marcus Sheffer, Sep 22, 2023, 11:29 am |
|
v4.1 July 2023 Guide- EAC ArbitrageNC-v4.1 EAc5: Renewable energyposted by Christina Hohman on Sep 19, 2023, 12:13 pm
The newest v4.1 Guide (July 2023) has added the following language - "Note that while the previous versions of LEED allowed for EAC arbitrage for on-site systems, LEED v4.1 requires the owner to... Last reply: Marcus Sheffer, Sep 22, 2023, 11:28 am |
|
Porch lighting included in building energy model?NC-v4.1 EAc2: Optimize Energy Performanceposted by Rachel Novick on Sep 20, 2023, 5:18 pm
Our building has a large open-air porch that we use for parties. It has lights and ceiling fans. Is that electricity included in the building energy demand calculation that is used to determine... Last reply: Marcus Sheffer, Sep 22, 2023, 11:22 am |
|
On-site and off-site renewable energyData-Centers-NC-v4.1 EAc5: Renewable energyposted by Urban Green on Sep 21, 2023, 2:11 am
A new data center will be constructed in a university campus. If the new building connects with the renewable energies generated within the campus but not within the building site boundary, can... Last reply: Marcus Sheffer, Sep 22, 2023, 11:21 am |
|
Sample transit documentationCS-v4 LTc5: Access to quality transitposted by Vanessa Rosado on Sep 22, 2023, 8:07 am
Hi My question is about the example provided "The Frick Collection 1E 70th St, New York" for this credit, which is: there is a note saying that "No one transit mode comprises more than 60... |
|
Interior Adhesives and Sealants- special adhesivesNC-v4 EQc2: Low-emitting materialsposted by Azra on Sep 18, 2023, 11:18 am
The project we are working on requires the use of specialty adhesive with high... Last reply: Reinhard Oppl, Sep 22, 2023, 4:47 am |
|
Concrete Bond Breaker and Curing CompoundNC-v4.1 EQc2: Low-emitting materialsposted by Joseph Snider on Sep 21, 2023, 11:49 am
Working on a warehouse project and we had two products that we were unsure about. There is a Bond Breaker and a concrete curing compound. Both products get applied to the concrete but... Last reply: Dave Hubka, Sep 21, 2023, 12:53 pm |
|
Are there any work arounds for the Smoking Rooms especially for Airports in the Middle East?NC-v4 EQp2: Environmental tobacco smoke controlposted by Katrina Hernandez on Sep 21, 2023, 8:51 am
We work on airports quite often and the location of these Airports are in the Middle East -- which everyone knows can be quite hot. LEED V4 does not allow smoking rooms in the building and... |