Log in
Forum
Topic

Average time expenditure for LEED Project Administration

LEED Rating System Selection
posted by KC Kurtz on Jun 26, 2011, 1:24 pm

All --

I work for a small Design-Build company in Durham, NC and we are looking to certify our new office building (12,000 sq. ft adaptive...

Last reply: David Posada, Jun 27, 2011, 3:03 pm

Process loads different between proposed & baseline designs

NC-2009 EAc1: Optimize Energy Performance
posted by Santiago Rodriguez on Jun 27, 2011, 11:40 am

For a major renovation of a restaurant they have made a major substitution of old kitchen appliances to new, more efficient equipment. Can this be included into the energy modeling of the...

Last reply: Susann Geithner, Jun 27, 2011, 2:38 pm

Layout for retail spaces

CS-2009 IEQc8.2: Daylight and views - views
posted by Rubén M. R. on Jun 9, 2011, 2:55 pm

Hi,
I am working on a C&S building, it will be mainly occupied by offices and we have a proposed layout for those spaces. The ground floor is for retail,
do we need to prepare a...

Last reply: Susann Geithner, Jun 27, 2011, 2:21 pm

Climate zone outside the USA

NC-2009 EAp2: Minimum Energy Performance
posted by Xing Shi on Jun 25, 2011, 1:49 am

We just finished the design submittals of 2 projects in Jiangsu, China. Does ASHRAE set climate zone in China. In one review comment, review team suggested that we should choose Zone 3, however,...

Last reply: Ricardo Sobral, Jun 27, 2011, 2:10 pm

Load response programs with an automated activation system

Pilot-Credits EApc8: Demand response
posted by Cara Neary on May 14, 2011, 9:30 am

A...

Last reply: Tristan Roberts, Jun 27, 2011, 1:27 pm

Tenant Scope, Owner Scope, Tenant Guidelines

CS-2009 EAp2: Minimum Energy Performance
posted by Jennifer Preston on Feb 16, 2011, 11:13 am

I'm sure this questions has be asked before, but I cant seem to find the answer. Do forgive me if its repetitive.

Where is the line between tenant scope, owner scope and the Tenant...

Last reply: Christopher Schaffner, Jun 26, 2011, 11:38 pm

Multi-tenant light bulb tracking

EBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lamps
posted by David Grosdeck on Dec 13, 2010, 4:27 pm

The property managment office is responsible for all lighting replacements in the building with the exception of the task lighting. Our inventory includes over 18,000 light bulbs.

The...

Last reply: Michael Miller, Jun 25, 2011, 2:49 pm

Clarification of wording

Schools-2009 IEQc4.1: Low-Emitting Materials—Adhesives and Sealants
posted by Gary Atkins on Jun 24, 2011, 5:25 pm

In attempt to clarify the wording for IEQ4.1 and IEQ4.2 that states "...defined as inside the weatherproofing system and applied on-site..." does this mean that both conditions must be satisfied...

Last reply: David Posada, Jun 24, 2011, 8:27 pm

No local zonal regulation

CI-2009 SSc3.3: Alternative transportation - parking availability
posted by Steve Khouw on Jun 14, 2011, 4:40 pm

The project planned to have active vanpooling commuting, parking is provided by the LL, 5% of...

Last reply: David Posada, Jun 24, 2011, 8:16 pm

LEED for Retail: Qualifying for Option 4 (Parking Capacity)

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by John Klein on May 23, 2011, 1:24 pm

LEED for Retail Option 4 Path 1 states "size parking capacity must meet but not exceed minimum local zoning requirements". However, it is silent regarding a situation where there are no local...

Last reply: David Posada, Jun 24, 2011, 6:42 pm