Topic | Recent |
---|---|
Multiple Building (GROUP?) Project on Military BaseLEED Guidance for Campuses and Multiple Buildingsposted by Teta Brown on May 18, 2012, 8:17 pm
Hi All - we have a military base project in which the main building was planned from the beginning as a LEED project. Other buildings on this site are storage buildings & truck wash canopies... Last reply: Teta Brown, May 21, 2012, 1:07 pm |
|
Core Shell Version 2.0CS-2009 EAp2: Minimum Energy Performanceposted by Carolina Vergnano on May 21, 2012, 11:57 am
Hello, I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal... Last reply: Marcus Sheffer, May 21, 2012, 12:51 pm |
|
Residential unit spaces are regularly occupied?NC-2009 IEQc8.2: Daylight and views - viewsposted by Jean Marais on Apr 25, 2012, 9:28 am
NC project with some residential units included... 1) Which residential unit spaces are regularly occupied? Last reply: Lisa Sawin, May 21, 2012, 11:18 am |
|
Non-default values for Lr and MrCS-2009 EAc4: Enhanced Refrigerant Managementposted by Magnus Stagnäs on Feb 16, 2012, 8:01 am
According to the reference guide I can use non-default values for Lr and Mr if providing supporting evidence material. Our project will be connected to the a district cooling plant with rigorous... Last reply: Hernando Miranda, May 21, 2012, 9:43 am |
|
Can the Technical Controller on the project be the CxA as well?NC-2009 EAc3: Enhanced Commissioningposted by Maya Karkour on May 21, 2012, 3:51 am
Hello, We are working on a project which seeks to achieve EA c3. The client is asking if the Technical Controller, which is a third party independent from design or construction works,... Last reply: Chris Ladner, May 21, 2012, 9:02 am |
|
Option 2NC-2009 WEc1: Water Efficient Landscapingposted by Divjot Singh on May 19, 2012, 11:15 am
Option 2 states: Now I have a doubt. If I go for either of Path 1 or Path 2, I am using zero potable water for... Last reply: Tristan Roberts, May 20, 2012, 8:54 pm |
|
Can I use CONTROL as an energy saving strategy??CS-2009 EAp2: Minimum Energy Performanceposted by Esteban Undurraga on May 18, 2012, 4:07 pm
Dear all: We have an specific question related to the Whole Building Simulation of an office Building. The electricity distribution company established a maximum limit of energy use... Last reply: Marcus Sheffer, May 20, 2012, 8:13 pm |
|
FloodlightNC-2009 EAp2: Minimum Energy Performanceposted by Ameet AA on May 18, 2012, 12:03 pm
2. Lighting requirement from ASHRAE 90.1-2007 Appendix G? ASHRAE 90.1 Appendix G TABLE 9.4.5 identifies limiting lighting power... Last reply: Marcus Sheffer, May 18, 2012, 12:57 pm |
|
SCS Indoor Advantage or SCS Indoor Advantage GoldCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by Michele Helou on May 17, 2012, 10:54 am
I have SCS certificates for several furniture pieces I am reviewing submittals for - some Indoor Advantage, some Indoor Advantage Gold. What is the difference and when do I need the Gold... Last reply: Josh Jacobs, May 18, 2012, 12:11 pm |
|
Football pitches LEEd BoundaryLEED Guidance for Campuses and Multiple Buildingsposted by Ameet AA on May 18, 2012, 12:01 pm
1. We have registered a campus level project (football Academy) with multiple buildings using 2010 AGMBC with the aspiration of a single Certification for the entire development. The site... |