Hello,
I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal to the Baseline or show 14% saving according to the New Construction version 2.2.
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5906 thumbs up
May 21, 2012 - 12:51 pm
Projects registered after June 27, 2007 are subject to the two point minimum (14% savings). Prior projects meet the prerequisite by exceeding 90.1.