4037 search results for "zero lot line"
Topic | Recent |
---|---|
COVID pilot credits- sample policy / plan documents?Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Agnes Vorbrodt on Jun 25, 2020, 12:23 pmHatice G. SCHOLZE-THOST Planen und Beraten LEEDuser Basic Member 12 thumbs up July 14, 2020- 5:14 am Are there any sample plans? Log in or register to post comments Brightworks Sustainability Brightworks Sustainability LLC LEEDuser Premium Member 47 thumbs up September 30, 2020- 11:23 am A lot of public entities, especially schools have public guidances you can pull from. There are also plenty of templates online. As few that I have found:- https://wmich.edu/sites/default/files/attachments/u709/2020/COVID%20Safe...- https://www.bfhd.wa.gov/UserFiles/Servers/Server_10765972/File/Applicati...-... Last reply: Torsten Biernat, Oct 30, 2023, 10:15 am |
|
All ACP for international projects allow Metric Unit submittalsGeneral forumsposted by Jean Marais on Oct 28, 2011, 1:56 amusing Metric convert any measurements to Imperial units for use in the forms. We interpret this to mean that the LEED On-line forms still need to be filled out with imperial measures but that metric... Last reply: Elodie DUMAS, Jun 18, 2012, 4:31 am |
|
Bike Rack requirements for buildings outside project scopeGeneral forumsposted by Erin Holdenried on Jul 6, 2012, 1:24 pmof parking for green cars for SS Credit 4.3. The vehicles are owned by the owner and are parking in an interior secure parking lot. The vehicles are in closest parking spaces to the three LEED buildings but there are closer parking spaces to the the non-LEED building. The trouble with the closer spaces is that they are intended for employee parking which are outside the secure lot. The two projects will be submitted... Last reply: Erika Duran, Apr 11, 2014, 10:33 am |
|
Silver or higher membership required for member discountsGeneral forumsposted by Hernando Miranda on Sep 17, 2012, 1:22 pmcomments Gordon Ingerson Principal KPN Architects, LLC LEEDuser Basic Member August 6, 2013- 10:20 am We have also been getting a lot of messages from the USGBC about membership renewal. I suspect that many... Last reply: Gordon Ingerson, Aug 6, 2013, 10:20 am |
|
The role of concensus in green rating systemsGeneral forumsposted by Bill Swanson on Jul 18, 2013, 10:36 amI don't see anything preventing USGBC from developing LEED into another ANSI standard. Then the 3 different groups would be encouraged by ANSI to work the standards into a single one. I see a lot of ways... Last reply: Paula Melton, Dec 3, 2013, 1:51 pm |
|
PrimersNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Michelle Rosenberger on Nov 8, 2012, 2:33 pmMichelle, as a side note if you use a lot of Sherwin Williams products, they have a really helpful VOC Reference Guide which lists the VOC category that each product complies with. You can find it here:... Last reply: Tristan Roberts, Feb 14, 2013, 7:01 pm |
|
Password and Zone Floor Area questionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Gabriela Almquist on Dec 3, 2012, 4:14 pmFloor Area. This is how I'm calculating it: If my room has no windows, then its ZFA is zero. If 100% of the Floor Area is regularly occupied, then the Floor Area and Zone Floor Area have the same square footage. Is this corret? I have a 3203sf room with 171sf of window area (which seems like a lot to me) and the Tvis is 0.397. According to the spreadsheet, the VLTxWFR is supposed to be between 0.15... Last reply: Jill Perry, PE, Mar 8, 2013, 11:28 am |
|
Annual Weather Normalized Source Energy IntensityEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Stefanie Hoffmann on Jan 24, 2013, 8:57 amin or register to post comments Stefanie Hoffmann HAAGA HELIA OY Ab LEEDuser Basic Member 6 thumbs up January 25, 2013- 3:47 am Thank you a lot for your quick reply, Ravi. It seems that now we won't even... Last reply: Ravi Bajaj, Apr 2, 2013, 6:58 pm |
|
Calculating Stormwater Treatment VolumesNC-v4 SSc4: Rainwater managementposted by Joshua Radoff on Jul 22, 2015, 11:40 pmout in the Reference Guide because LEED is giving a lot of leeway to the civil engineer to demonstrate compliance. Log in or register to post comments Joshua Radoff Renewable and Sustainable Energy... Last reply: Michael DeVuono, Sep 2, 2015, 9:03 am |
|
Automatic Receptacle ControlNC-v4 EAp2: Minimum Energy Performanceposted by Jan Hesse on Aug 7, 2015, 6:36 amthere are not a lot of tools for smaller projects. Larger projects can control circuits, and through careful electrical design, meet many of the requirements. Workstations continue to be an issue. Many system furniture... Last reply: Marcus Sheffer, Mar 25, 2020, 11:58 am |