4026 search results for "zero lot line"
Topic | Recent |
---|---|
Post your questions about Passive House herePassive House Discussion Forumposted by Paula Melton on Mar 4, 2019, 9:44 amyour design.- Typically has lots of insulation. 20-40-60 type levels. (20-underground, 40-walls, 60-roof) Does vary based on climate and modeling.- Air tight envelope. Will require ERV or HRV... Last reply: Brian Cornwell, Apr 17, 2023, 3:58 pm |
|
LEED and Safety Officer Duties and ResponsibilitiesCS-2009 MRc2: Construction Waste Managementposted by Ann E on Mar 4, 2019, 8:52 pmsince the procedures are probably quite different to what they are used to on other projects. You should inspect the “Construction Activity Pollution Protection” measures regularly…take lots of photos…and... Last reply: Adam Insan, Dec 6, 2019, 9:19 am |
|
Future Municipal Greywater System Near SIte WEc1NC-2009 WEc1: Water Efficient Landscapingposted by MANNY IGLESIA on Mar 26, 2019, 2:43 pmis either new or has never done it before. What will help you is to find a similar CIR on this issue to avoid paying for an appeal. You can also email the Reviewer before you submit the final credit on-line... Last reply: MANNY IGLESIA, Jul 16, 2019, 3:45 pm |
|
Number/Location of water meterNC-v4 WEc4: Water meteringposted by Summer on Jul 21, 2019, 5:14 amSustainable Services Surmount LEEDuser Basic Member 29 thumbs up February 21, 2023- 5:03 am You can provide water meters separately for the water line only connected to plumbing fixtures, not required for every plumbing fixture or floor. If there is any further pantry served on the same line, then a separate water meter is to be provided from the pantry water line. Log in or register to post comments Aleksandra Suchomska LEEDuser Basic Member February 21, 2023- 5:16 am Devendra, thank you, that is very helpful. Could you tell me what do you think about this situation: I have water line connected to all plumbing... Last reply: Olga Yuil, Feb 22, 2023, 6:45 pm |
|
Equity & Community BenefitsNC-v4.1 LTc3: High Priority Site and Equitable Developmentposted by Xavier Mora on Jan 28, 2020, 5:49 amthe developer has control over a lot of land, money, and jobs, and the local government might be contributing funding or closely managing the development. So while a lot of these CBAs and equity plans have great... Last reply: Grace Friedhoff, Mar 9, 2022, 2:51 pm |
|
Campus Shuttle Services- Not CountedNC-v4.1 LTc5: Access to quality transitposted by Levi Jimenez on Feb 13, 2020, 12:18 pmWe are in the process of developing a campus, quite substantial in size. There is a train station with several train lines and two bus stops within a half mile, but not quite close enough in walking distance to meet the credit requirement for the attentional stops. There is a massive transportation effort being developed in coordination with the local transportation authority to get private busses into the campus and deliver people to other major hubs around the area, including long distance stops and connection to each of the major train stations. The shuttles are expected to move nearly... Last reply: GABRIELA TREVINO, Jan 19, 2022, 4:43 am |
|
Translucent fixture for strategy DNC-v4 EQc6: Interior lightingposted by Omar Elrawy on May 12, 2020, 9:28 amcheck out the v4.1 requirements instead- no more ABCDEF- and the glare control considerations have changed a lot. Always recommend switching this credit out. Log in or register to post comments ... Last reply: Karen Joslin, Oct 27, 2022, 3:05 pm |
|
Option 2 Optimization- from what?NC-v4.1 MRc2: Environmental Product Declarationsposted by Margaret Montgomery on May 20, 2020, 6:03 pm06/30/2019- 06/30/2022 EPDAP-110 Interior Coatings ProMar© 200 HP Zero VOC 06/30/2019- 06/30/2022 EPDAP-102 Interior Coatings ProMar© 200 Zero VOC 06/30/2019- 06/30/2022 EPDAP-101 Interior Coatings ProMar© 400 Zero VOC 06/30/2019- 06/30/2022 EPDAP-103 As I said on another thread, USGBC has confirmed that an Action Plan can be considered "Critically Reviewed" if reviewed by an LCA expert (either... Last reply: Mikhail Davis, Jul 20, 2020, 4:59 pm |
|
Anyone here affected by the extension of the v3 sunset date to June 2022?LEED Rating System Selectionposted by Nadav Malin on Sep 24, 2020, 4:54 pmto post comments Deborah Lucking Director of Sustainability Fentress Architects LEEDuser Expert 258 thumbs up September 30, 2020- 6:45 pm Almost all our current projects are v4; they all came on line after... Last reply: Deborah Lucking, Sep 30, 2020, 6:45 pm |
|
DAYLIT AREA Op-2NC-v4 EQc7: Daylightposted by Ale g on Nov 24, 2020, 8:38 amor selecting the worst case between the 2 point-in-time for every single space, this dependent on the answer to 1.) (this should be YELLOW line in very simple example I've linked), OR should I use points of the grid calculation area that recieves illuminace 300-3000 lux for BOTH 3AM and 9PM (GREEN line in the linked example)? This is more restrictive (mathematical concept of intersection between two sets... Last reply: Ale g, May 6, 2021, 11:05 am |