4027 search results for "zero lot line"
Topic | Recent |
---|---|
Sustainable Criteria ValueCI-2009 MRc4: Recycled Contentposted by LUCY WILLIAMS on Oct 29, 2010, 2:55 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up October 29, 2010- 3:00 pm Lucy, this line is another way of saying "Total."In other words, all the MRc4–7 "sustainable criteria" are entered together on that same table. The bottom row totals each one of them up. Log in or register to post comments ... Last reply: Tristan Roberts, Oct 29, 2010, 3:00 pm |
|
All weather pathways?Pilot-Credits PC9: Street Networkposted by Cory Benson on Sep 27, 2010, 11:03 amand they must be "addressable." Publicly accessible means that streets are not gated and are not located within gated areas. "Addressable" means that streets are (or can be) lined by lots with postal addresses-- i.e., no parking lots, driveways, access ramps, and so on." So the answer is, the partially gated pathways would not count towards your intersection count, though this is not clear... Last reply: Peter Kennedy, Oct 26, 2010, 6:38 pm |
|
EQc8.2- Backup documentationNC-2009 IEQc8.2: Daylight and views - viewsposted by Prashant Kulkarni on Apr 23, 2010, 10:03 amCould you please share examples of submittal documentation for this credit, that is "drawings showing the line of sight from interior spaces through exterior windows in both plan and sectional views." Also if the building has approximately 120 different rooms (offices and patient rooms): 1. Do we draw sectional view for each space? 2. Is furniture requried to be shown in plan? IEQc8.2 ... Last reply: Jonathan Weiss, Oct 26, 2010, 9:38 am |
|
Is FSC particle board new or recyled?NC-2009 MRc7: Certified Woodposted by Walt Gosciewski on Apr 5, 2010, 2:45 pmchoose where I wanted to count it. It also sounds like there is a lot of synicism about the recycled qualification which would lead me to think that the FSC certification is the better certification... Last reply: Sonrisa Lucero, Oct 25, 2010, 8:57 pm |
|
Envelope mandatory provisionsCS-2009 EAc1: Optimize Energy Performanceposted by javier bolanos zeledon on Oct 24, 2010, 7:18 pmcomments javier bolanos zeledon LEEDuser Basic Member 243 thumbs up October 25, 2010- 12:07 pm Thanks a lot. Log in or register to post comments ... Last reply: javier bolanos zeledon, Oct 25, 2010, 12:07 pm |
|
printer rooms in tenant scope of workCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Victoria Lockhart on Aug 27, 2010, 9:43 amSusie Spivey-Tilson LEED Fellow, Senior Program Manager for Global Energy & Sustainability CBRE LEEDuser Expert 158 thumbs up August 30, 2010- 12:25 pm This isn't the first case where the Reference Guide and the Credit Form in LEED online contradict one another. My first line of defense would be to send a technical inquiry specific to the credit to GBCI and have them acknowledge the difference and to confirm if the legal language is required for credit compliance (more so than the recommendation to include in the Tenant Guidelines). Most tenants won't have copiers and printers that are high volume... Last reply: Victoria Lockhart, Oct 25, 2010, 11:45 am |
|
LEED V3- E-mail Communications and Role Identification MatrixNC-2009 MRc7: Certified Woodposted by Keerthi Ratnayake on Oct 22, 2010, 11:55 amit stated it right in the template and everyone literally had to sign their name. However, the V2009 On-line templates don't make it so easy...some templates require that certain diciplines initial... Last reply: Doug Pierce, AIA, Oct 24, 2010, 9:47 pm |
|
Wall on Site BoundaryNC-2009 SSc8: Light Pollution Reductionposted by Omer Moltay on Oct 23, 2010, 3:01 pmWe have a 2 m. high brick wall running all around out site. This wall belongs to the property so it is within the site boundary and the site boundary runs exactly along the outside surface of the wall. When making ground plane photometry calculations on the site boundary, should the calculation points be inside the wall or outside the wall? When outside, the values are obviously 0 fc due to the fact that luminaries are inside the site and the wall is casting shadow to the other side (although the 10 feet beyond site boundary calculations are not zero). When we calculate inside, we get higher... |
|
High power task lighting/ plug lightingCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Gahl Sorkin Spanier on Oct 10, 2010, 9:21 amin-line with the intent of LEED to include them. There are many very good, low wattage LED and CFL tasklights on the market that will provide plenty of additional light for task specific areas without... Last reply: Dane Sanders, Oct 21, 2010, 12:56 pm |
|
Recently announced RP credits for international projectsSchools-2009 RPc1: Regional Priorityposted by Bilge Ceylan on Oct 21, 2010, 6:53 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up October 21, 2010- 9:23 am Any LEED 2009 projects registered in LEED Online will have the credits automatically applied. You don't have to do anything!Where the credits have different thresholds, you only have to hit the lowest threshold. I discussed details and listed the credits in this LEEDuser post. Log in or register to post comments Bilge Ceylan Green Building/Project Management Consultant Individual Entrepreneur LEEDuser Basic Member 13 thumbs up October 21, 2010- 9:55 am Tristan, Thanks a lot... Last reply: Tristan Roberts, Oct 21, 2010, 10:19 am |