Log in

4026 search results for "zero lot line"

Forum
Topic

Resuming construction after 14 years under a new ownership.

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Esteban Velez on Jul 5, 2022, 3:44 pm

to post comments Esteban Velez LEEDuser Basic Member July 6, 2022- 12:58 pm Emily thanks a lot for your advice and time! You just reinforced my intuition. Will contact them as well.  Log in or register...

Last reply: Esteban Velez, Jul 6, 2022, 12:58 pm

using HPD as supporting documentation

NC-v4 EQc2: Low-emitting materials
posted by Erin Holdenried on Jun 29, 2022, 11:28 am

A lot of HPDs indicate the VOC content of a product and/or the emissions compliance (such as Greenguard Gold).  Would an HPD be accepted as supporting documentation from this credit, particulary if it's a self-prepared HPD?  This would really help streamline documentation across credits. EQc2 ...

Last reply: Erin Holdenried, Jun 29, 2022, 3:01 pm

Total Site Paving Area

NC-v4 SSc5: Heat Island Reduction
posted by Maria Perzon on Mar 7, 2018, 5:13 am

if we have to give up pursuing this credit or if we could still pursue this credit excluding the existing parking lot and add white roof (with high SRI value) and zero asphalt within the construction...

Last reply: Irene Chung, Jun 29, 2022, 10:46 am

Option 1. Path 1- poverty rate

NC-v4.1 LTc3: High Priority Site and Equitable Development
posted by Jennifer Atherton on Jun 28, 2022, 5:18 pm

Claudia Mezey Consultant, Built Ecology WSP USA LEEDuser Expert 14 thumbs up June 28, 2022- 6:21 pm Hi Jennifer!  Good question.  From my understanding, LIM-AT (%) is more of an informal poverty level metric.  The official poverty line is measured by the "Market Basket Measure", which isn't readily extracted from Statistics Canada.   Another option to try is documenting via household income... I'd recommend using Statistics Canada's data viewer for the 2016 Census  here.   First, I've filtered the "Geographic Level" as "Province or territory"; ...

Last reply: Claudia Mezey, Jun 28, 2022, 6:21 pm

Quality View_Views into Atrium

NC-v4.1 EQc8: Quality Views
posted by Ilaria Colombo on Jan 28, 2022, 10:18 am

that there is no longer any need to consider this requirement "multiple lines of sight to vision glazing in different directions at least 90 degrees apart" in the calculations? Log in or register to post comments...

Last reply: Sara Goenner Curlee, Jun 23, 2022, 3:56 pm

innovation credits

NC-v4 INc1: Innovation
posted by Alexandre DENEUVILLE on Jun 17, 2022, 4:45 am

or classroom buildings, or any other project with a lot of reguler and repeat "visitors", do we need include, or run a separate survey for these occupants, or is it just for FTEs? Log in or register...

Last reply: Susan Di Giulio, Jun 17, 2022, 3:38 pm

Exempt from Indoor Water Efficiency pre-requisite?

NC-v4 WEp2: Indoor water use reduction
posted by Lawrence Lile on Feb 21, 2018, 12:23 pm

will use, regardless of scope/location of those fixtures. I would doubt that there are zero restrooms or other fixtures in the whole building for your occupants/visitors, unless maybe you have a warehouse or something along those lines. In general, if a building has at least 1 full-time equivalent employee (requirement to even pursue certification), there should typically be facilities available for use. Can you...

Last reply: emily reese moody, Jun 15, 2022, 5:34 pm

browser compatibility

Navigating LEED Online
posted by emily reese moody on Mar 22, 2017, 7:43 pm

https://leeduser.buildinggreen.com/forum/leed-online-now-leed-line Log in or register to post comments Dee Spiro LEEDuser Basic Member 30 thumbs up May 21, 2021- 3:31 pm Hi Emily and thanks for the information.  I looked up the actual sunset date for IE,...

Last reply: emily reese moody, Jun 14, 2022, 3:47 pm

Minimum Energy Performance Calculator

NC-v4 EAc2: Optimize Energy Performance
posted by Sarah Leenknegt on Jun 13, 2022, 6:28 am

Hi I am wondering if I am alone in this.. On each LEED Project, I waste a lot of time to enter data in the Excel Performance Calculator. In a lot of cells, after entering the data, I am waiting about 30 seconds while the document is frozen, before I can continue. Apart from the actual waiting time, this breaks up the workflow and makes is very inefficient.  Furthermore, there are some problems...

Last reply: , Jun 13, 2022, 9:08 am

Separation of Service Sinks and Indoor Fixtures

NC-v4 WEc4: Water metering
posted by Timothy Ian Middleton on May 6, 2022, 12:15 am

We have a project where we have irrigation, restaurant tenants, indoor fixtures and service sinks. The 1st 2 are easily metered, but it is not easy to separate the indoor fixtures and service sinks. Our building is a 20 storey office tower, each floor has one supply line serving (1) service sink (2) wall mounted fixture for cleaning and (3) pantry and M/F restrooms (fixtures described in WEp2/WEc2). After our 1st submission we just got a comment from the LEED Reviewer: " The documentation does not confirm that the non-fixture usage (e.g. service sinks, etc.) is measured and can be deducted...

Last reply: Summer Minchew, Jun 10, 2022, 3:42 pm