4026 search results for "zero lot line"
Topic | Recent |
---|---|
Mixed Use Residential with C&S retail on ground floorNC-2009 IEQc6.1: Controllability of systems - lightingposted by Erica Downs on Sep 17, 2013, 4:52 pmPartner Ecoimpact Consulting LEEDuser Expert 170 thumbs up March 29, 2017- 10:30 am Erica: We haven't submitted this credit for review yet but I would list them as individual line items within the form... Last reply: Erica Downs, May 25, 2017, 5:13 pm |
|
equipmentNC-2009 IEQc8.1: Daylight and views - daylightposted by Oleg Petryuchenko on Sep 30, 2013, 10:13 amTODD REED Energy Program Specialist PA DMVA LEEDuser Expert 888 thumbs up September 30, 2013- 3:23 pm If you have large pieces of permanently mounted equipment, you may exclude the area it occupies from the total regularly occupied space. However, you must include it in your calculations. So if using simulation, it must be included in the simulation model in some form. This would also be true with the views credit, these pieces of equipment basically are large partitions and need to be included in your sight line drawings. Log in or register to post comments Jill Perry, PE Consultant Jill Perry, LLC... Last reply: Oleg Petryuchenko, Feb 19, 2014, 3:30 pm |
|
Equivalents in EuropeCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Mike D on Oct 4, 2013, 12:52 pmyear, Energy Efficiency ratio and Testing protocols. That seems a lot and not feasible. On the other hand in LEED V4, you need to compare the info that is on the Energy Star website. For refrigerators... Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Jun 18, 2014, 9:20 pm |
|
Is it LEED certifiable?LEED Rating System Selectionposted by Marcio Alberto Casado Pereira on Nov 5, 2013, 11:56 amWe have the following development: a 50acre lot is going to be divided up in smaller units of 5000sqft and each lot will have a residence, a house. The common area of the 50 acre lot will have 3 buildings: a 650sqft for security, a 1080sqft administrative building, and a 11840sqft club with amenities for the residents. This club will include pool, game room, fitness room, conference room, and others. None of the spaces within the club will be permanently occupied, meaning there will be no offices, for instance; occupation will be intermitent by the residents. The client wants to certify the group:... Last reply: Marcio Alberto Casado Pereira, Nov 5, 2013, 1:57 pm |
|
Dormitories- LEED NC?LEED Rating System Selectionposted by Maya Karkour on Feb 17, 2014, 12:12 pmand therefore is not an option. Thanks a lot LEED-NC 2009 ... Last reply: Adrienn Gelesz, Mar 14, 2014, 3:55 am |
|
Can I register a Mock or Dummy Project for training purposes?General forumsposted by John Smith on Dec 8, 2013, 2:39 pmRepresentative Vermont House of Representatives LEEDuser Expert 11477 thumbs up December 9, 2013- 12:29 pm John, a lot of leading firms get practice by doing a real LEED certification of their own building... Last reply: Tristan Roberts, Dec 9, 2013, 12:29 pm |
|
Full Envelope Commisioning ScopeNC-2009 EAc3: Enhanced Commissioningposted by Jean Marais on Dec 12, 2013, 10:39 amThis even more than MEP commissioning is where the benefit is accrued…before something is installed. In MEP, a lot depends on the programming, so must wait until a lot of work is done. In the case... Last reply: Jean Marais, Jan 22, 2014, 2:23 am |
|
HOV vs. Carpool/VanpoolNC-2009 SSc4.4: Alternative transportation - parking capacityposted by William Weaver on Mar 10, 2014, 5:13 pm"carpooling" doesn't make a whole lot of sense. Log in or register to post comments William Weaver LEED Fellow, WELL AP JLL LEEDuser Basic Member 181 thumbs up May 20, 2014- 5:24 pm Not yet. The estimated... Last reply: William Weaver, Aug 27, 2014, 1:49 pm |
|
3 floors + Attic: LEED Homes or LEED NC?LEED Rating System Selectionposted by Mario S. on Apr 3, 2014, 9:50 ama maximum height of around 2.9 m at the middle and takes around half of the 3rd floor roof area. My own assumption is that a floor is a separate apartment, but i might be wrong about that! The bottom line is:... Last reply: Mario S., Apr 9, 2014, 3:30 am |
|
LEED V4 Reference GuideGeneral forumsposted by Erika Duran on Apr 4, 2014, 1:22 pmare a mouthful.What line would you rather say:"So team, how are we coming on Building Product Disclosure and Optimization—Environmental product declarations?"OR"So team, how are we coming on MRc2?"... Last reply: Erika Duran, Jul 3, 2014, 9:32 am |