Forum
Topic

Number/Location of water meter

NC-v4 WEc4: Water metering
posted by Summer on Jul 21, 2019, 5:14 am

Sustainable Services Surmount LEEDuser Basic Member 29 thumbs up February 21, 2023- 5:03 am You can provide water meters separately for the water line only connected to plumbing fixtures, not required for every plumbing fixture or floor. If there is any further pantry served on the same line, then a separate water meter is to be provided from the pantry water line. Log in or register to post comments Aleksandra Suchomska LEEDuser Basic Member February 21, 2023- 5:16 am Devendra, thank you, that is very helpful. Could you tell me what do you think about this situation: I have water line connected to all plumbing...

Last reply: Olga Yuil, Feb 22, 2023, 6:45 pm

What do you think?

LEED v4.1 for Building Operations and Maintenance
posted by Paula Melton on Mar 28, 2018, 3:58 pm

them here (I know it is a lot) hoping someone knows the answer for a few of them, maybe. Note: I will also post on specific credit foruns as well. Questions here:...

Last reply: Ricardo Filho, Feb 21, 2023, 4:44 am

Black box or transparent benchmarking?

LEED v4.1 for Building Operations and Maintenance
posted by Nick Semon on Mar 29, 2018, 7:54 am

I am going to post them here (I know it is a lot) hoping someone knows the answer for a few of them, maybe. Note: I will also post on specific credit foruns as well. thanks!! Water efficiency a)    What...

Last reply: Ricardo Filho, Feb 21, 2023, 4:42 am

Hydrozones

NC-v4 WEp1: Outdoor water use reduction
posted by Charles Hall on Feb 13, 2018, 5:11 pm

I am a little unsure about how to generate hydrozone areas. For instance, with a group of trees, do I draw a polygon around the probable drip line and use that as an area?  WEp1 U.S. and Canada ...

Last reply: Julio Fernandez Amodia, Feb 14, 2023, 11:02 am

Acoustic Performance Credit for Residences

NC-v4 EQc9: Acoustic performance
posted by Andrew Parise on May 9, 2018, 5:21 pm

use it, as it wasn't super recent for me and they asked me to upload their email response that this was allowed. This version is much more in line with what our acoustic consultant recommends...

Last reply: Emily Purcell, Feb 9, 2023, 4:20 pm

Occupancy rates Appendix 2 Daily averages or peak occupancy

NC-v4.1 WEp2: Indoor water use reduction
posted by Julio Fernandez Amodia on Oct 17, 2022, 12:18 pm

Hi there, I am currently calculating the peak occupancy and daily average occupancy for a mall building. I am very confuse whether the occupancy rates in appendix 2. Default occupancy counts refer to daily average occupancy values or peak occupancy. In the case of employees occupancy is simple, since this number is roughly the same. But the transient occupants might vary a lot, the peak occupants will be much lower than the average daily occupancy.  Please could you clarify this point? Thanks WEp2 ...

Last reply: Julio Fernandez Amodia, Feb 9, 2023, 4:08 am

Waste Hauler

NC-v4 MRc5: Construction and demolition waste management
posted by Stacey Schmidt on Feb 7, 2023, 10:06 am

I work for a waste hauler and am trying to figure out if there is any certification that we need in order to help LEED builders. We have come across a few constructions companies in Arkansas that are in need of LEED waste haulers and I have been researching a lot of different sites but cannot find clarification on waste haulers. All help is greatly appreciated.  MRc5 ...

Last reply: Erica Downs, Feb 8, 2023, 1:15 pm

Need to get clear Idea about requirement of Enhanced IAQ

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Nagaraj Sankar on Feb 6, 2023, 1:25 am

Maria Porter Sustainability specialist Skanska Sweden LEEDuser Premium Member 271 thumbs up February 6, 2023- 3:10 am Nagaraj, In my experience they do require the self-closing doors. However, do remember that this requirement is for rooms that are “…space where hazardous gases or chemicals may be present or used…”. While toilets may be smelly, they are not considered hazardous. And for printer rooms, check if they are high volume or not. If not, they are excluded. (I think it was 40 000 copies a month that was the limit). Where I live, copying has decreased a lot in the last 10 years as we have...

Last reply: Maria Porter, Feb 6, 2023, 3:10 am

Medical Office Building- Exam | Soiled/Clean Workroom | Mop Sinks- What fixture should these be listed as on the form?

NC-v4.1 WEc2: Indoor water use reduction
posted by Catherine Blakemore on Dec 18, 2020, 12:07 pm

as a typical group restroom. As long as all of your occupants have access, the % per line item should remain 100%. What will be different is the field at the top-ish, under the occupancy table, where you'll...

Last reply: emily reese moody, Feb 2, 2023, 12:13 pm

RESORT DEVELOPMENT IN ISLAND

Hospitality-NC-v4 SSc3: Open space
posted by Amal Venugopal on Jan 27, 2023, 8:36 am

This is for a resort development project in an island with splendid views. The project has lot of open spaces with both circulation paths and spaces with just sand & view to the beach. For earning this credit should only the area with landscape and recreation area be counted or can other non-circulation areas can also be considered as open space? SSc3 ...

Last reply: Amal Venugopal, Jan 31, 2023, 2:49 am