Performance Measurement—Building Automation System
Filter by location
Forum
Topic
Replies
Recent

Lighting Controls in Unoccupied Spaces

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Clint Fogg  on 

Good afternoon, I am working on credit EAc3.1 for an EBOM project in an Office Building built in 1904.  I am looking for information with regards to the 100% lighting control statement. 

1
Wed May 2, 2018, 12:51 pm

BAS - whole building

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Craig Wilson  on 

If our project's BAS controls 100% of the building's heating and air conditioning, but only 35% of the building's ventilation (by square footage), can we still pursue this credit?

1
Thu Dec 11, 2014, 8:28 pm
1
Mon Nov 15, 2010, 3:20 pm

BAS

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  VISHESH AGARWAL  on 

Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.

1
Tue May 17, 2016, 12:27 pm
1
Wed Jul 21, 2010, 10:17 pm

Humidity

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Gustavo De las Heras Izquierdo  on 

I was wondering if there is a minimum set of comfort parameters which HAVE TO be measured by the BAS.

1
Fri Mar 7, 2014, 2:39 pm

Tenants

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Gustavo De las Heras Izquierdo  on 

Our project is an office tower with 30 tenants. Does the BAS need to control tenant's systems?

1
Tue Apr 26, 2016, 11:48 am

sample BAS docs

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Tristan Roberts  on 

Thanks to David Hubka, LEEDuser has added two sample documents to our Toolkit for this credit—a BAS summary report, and a preventive maintenance checklist.

0

Sensors calibration during the performace period

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Agnieszka Rylska  on 

Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?

1
Thu Dec 10, 2015, 3:18 pm

Lighting Controls Exemption

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Katherine Roth  on 

Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.

3
Tue Dec 15, 2015, 8:27 pm