Renewable energy for LEED Core and Shell for Data Center
CS-v4 EAc5:Renewable energy productionposted by Rajat Wadhwa on
Hi,
I wanted to clarify how the renewable energy percentage is calculated for Core & Shell projects, specifically for data centers.
Arbitrage option
CS-v4 EAc5:Renewable energy productionposted by Beth Brownlie on
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form?
Multi-building project - installing renewables on only 1 building
CS-v4 EAc5:Renewable energy productionposted by Shannon Oletic on
We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach).
Do we need to included tenant area in renewable energy calculation for CS building?
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Dear All,
RE: v.4 Core & Shell - RECs as Offsite Power
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Hi LEED user,
We have a C&S project includes retail and office towers with limited space for renewable power generation.
Solar panels outside LEED boundary
CS-v4 EAc5:Renewable energy productionposted by Jefferson Au-Yeung on
Hi
Future renewable energy within the leed border
CS-v4 EAc5:Renewable energy productionposted by Instra Ingenieros on
Hi!
Core and shell building’s energy
CS-v4 EAc5:Renewable energy productionposted by Devendra Chaughule on
Dear All,
We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by green power, REC and or offsets.
Definition of "utility service area"
CS-v4 EAc5:Renewable energy productionposted by Helena Larsson on
Hi,
Can you please provide som insight as to what "utility service area" refers to? Within the city limits or is there another way to define this a bit clearer.
Kind regards