Forum quick links
Commissioning on C&S building not complete because of push back
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Edgar Arevalo on
My team is having an issue with the mechanical contractor who installed lab exhaust fans in the buildings. The commissioning agent was suppose to test those fans but the mechanical contractor
Commissioning of existing equipment not in scope?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Brian Salazar on
Hi all! We received feedback from the LEED review team on Cx that I had not seen before. We have a Core & Shell building where the exisitng Domestic Hot Water heater was retained.
C+S Building removing HVAC scope
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Karina Hanyzewski on
Hi there!
Commissioning existing energy systes
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ken Dooley on
We have building renovation that is refurbishing 80% of a building aiming for CS 2009.
LEED NC - Tenant Commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jennifer Preston on
Our base building will be fully commissioning, but the small first floor tenant fit out is not in the scope of the project, beyond providing base building systems.
Cx and contractors
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jean-Baptiste Noel on
Hi all, Our current project is a Design & Build, for which the MEP contractors are required to hire a third party to commission their systems (so each MEP will probably have a different compan
commissioning vs phasing out construction
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Catharina B on
Hello We are working on the project, which include 2 independent buildings: A & B (each 7 stories above grade has own mechanic, energy system and entrances ) and 1 floors underground parking sp
Residential HVAC included in commissioning scope of LEED CS?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorng-ren Chern on
I am working on a condominium project which is planning to certify LEED CS.
HVAC Contractor as CxA for EAp1?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Tony Schafer on
Is it possible for an employee of the HVAC contractor to be the CxA for fundamental commissioning only?