Our project is an office building with 10 floors on the top are leased out as a hotel tenant and we are seeking for LEED CS certified.
If the mechanical and electrical plant of the hotel are separated from the base building, can we do the commissioning scope cover only the core and shell of the base building and not include the hotel part which is only one big tenant?
However, can we include the hotel electrical and mechanical equipment in the energy simulation?
Chris Ladner
PartnerViridian
261 thumbs up
November 21, 2011 - 9:18 am
The scope of the systems applied for the project should be consistent. The Cx and modeling should cover the same scope of systems.