Pilot-Credits SSpc82:Local food productionposted by Stephen Ward on
Does having an apiary on our campus count towards the amount of area reserved onsite for food production?
Calculating landscaping
NC-v4 SSc2:Site development - protect or restore habitatposted by Tracy Jordre on
My question is related to both the Protect or Restore Habitat and Open Space credits. In the past I have included the total area of any landscaping bed, not just the area of each plant themse
Artificial Turf - Considered Hardscape?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Marina Wrensch on
I am working on the LEED documentation for SSc7.1 for a softball stadium. The infield is clay and the outfield is artificial turf.
E-waste
CI-v4 MRp1:Storage and collection of recyclablesposted by Agnieszka Rylska on
Is it enought that the tenant only will provide a safe storage for e-waste or is it required that the building also provides a central storage for all tenants?
Software for Energy Modelling
NC-v4 EAc2:Optimize energy performanceposted by Andrea Valentini on
Hello.
I'm working on a project in Italy and evaluating to buy a new BIM software.
Is there anyone who knows if it's possible to analyze our building with a proper BIM SW?
Shared walls with another structure in baseline and proposed
NC-v4 EAc2:Optimize energy performanceposted by Christine McKinley on
Hello,
In my baseline model, can I show shared walls as exposed to exterior and then in my proposed model treat that wall as a partition?
AIA Resolution for Urgent and Sustained Climate Action
posted by Michael Davis on
Greetings, green gurus:
Major renovation to existing building - EQp1 requirements
NC-v4 EQp1:Minimum indoor air quality performanceposted by Navisa Jain on
We have a 6 storey addition to an existing 4-storeyed building. The mechanical systems for the addition are separate from the existing systems.
Time Based Sensor Flash Valve for Dual Flash
NC-2009 WEc3:Water Use Reductionposted by Orçun Özhelvaci on
We have a project where we can only use Flash Valves for WC instead of Reservoir.
Metering make-up water for geothermal system
NC-v4 WEc4:Water meteringposted by Daniel Davis on
We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?