Forum quick links
Park project with underground car park
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Osama Touni on
Hi,
Metered faucet duration
CS-v4 WEp2:Indoor water use reductionposted by Lisa Marshall on
Hello, I have received a comment from a reviewer stating we needed to use the a duration of 30 seconds on a metered faucet. I don't know many people who wash hands for 30 seconds. What
Formaldehyde resins in mineral wool insulation and firesafing
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Larry Jones on
Credit language for IEQc4, Group 4 requires all “Batt insulation products” inside the weatherproofing system to “contain no added formaldehyde, including urea-formaldehyde, phenol formaldehyde and
Material Ingredient Optimization & where to find plans & assessments
CI-v4.1 MRc5:Material Ingredientsposted by Carina Clark on
In looking at the new 4.1, where can I look to determine if a products meets either the Action plan, the Advanced screening & assessment, or the Full assessment?
VCT floor Polish product that is LEED V4 compliant
NC-v4 EQc2:Low emitting materialsposted by Andrew Nelch on
We are installing Armstrong Bio Based Tile that requires a polish after install. We are looking for a LEED V4 compliant floor polish product that meets the VOC and TVOC requirements.
100 % Non potable power - No Compliance
NC-2009 WEc1:Water Efficient Landscapingposted by SAMY Chamy on
Dear All:-
Our project is use 100 % recycled water for irrigation (ETP Treated water) and so it is option 2 - path 1 and we have met the
Open Aircraft Hangar, No HVAC
NC-v4 EAc2:Optimize energy performanceposted by Adam Fitzpatrick on
We are designing an open aircraft hangar in southern Alabama that will not have any HVAC equipment. How would we go about pursuing Optimize Energy Performance credits?
Water meter installation location
EBOM-v4 WEp1:Indoor water use reductionposted by Shathiswara Rao on
The potential way to target water reduction is by monitoring the water use for flushing. Is it necessary to install a water meter for each piping that goes to separate toilets?
MRc1 Option 3
NC-v4 MRc1:Building life-cycle impact reductionposted by Barbara Clarke on
We have the calculations sf for our existing exterior enclosure and areas to be reused (excluding windows). How do we calculate the Exterior structure?